Browse
Search
Minutes 02-14-2012
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2012
>
Minutes 02-14-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 3:01:34 PM
Creation date
4/4/2012 3:01:32 PM
Metadata
Fields
Template:
BOCC
Date
2/14/2012
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 02-14-2012 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 02-14-2012 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Triangle Regional Transit Program <br />Orange County Transit Plan <br />February 14, 2012 <br />Orange County: HOME <br />Orange County: Population Distribution <br />Key Point: Rural and Urban Townships <br />Have Many Transportation Needs in Common <br />- Many residents work at either UNC or Duke <br />Focus: Mebane-Hilisborough-Durham Route and Route 420 <br />Park & Ride: TCRP (Transit Cooperative Research Program) Report 95 <br />"The majority of park-and ride users typically come from within 5 miles and more than 80 <br />percent fravel less than 10 miles to their facility." <br />Different for UNC Workers: 58% drive more than 10 miles to their Park & Ride lot <br />Source: UNC <br />Campus Commuting Study, 2010 <br />It is estimated that 90-95% of Orange County lives within the Park & Ride catchment <br />areas <br />Durham-Orange Corridor Technology: <br />Light Rail Transit vs Bus Rapid Transit <br />Operating Costs: Bus vs. Rail, National Experience <br />Economic Development, National Experience <br />Can BRT be done cheaper than projected in AA? <br />Speed Is Expensive. Lower cost = lower benefits. <br />Some "BRT" projects are not at all "rapid transit" <br />Cleveland, OH Euclid Corridor (Source: ITDP 2011) <br />$7 million / mile; Average speed: 12.5 mph <br />Los Angeles Metro Orange Line , <br />$28 million / mile; Average speed: 18 mph <br />Proposed Durham-Orange BRT-Low Alternative <br />
The URL can be used to link to this page
Your browser does not support the video tag.