Orange County NC Website
13 <br /> Towers and Wireless.Facilities 0047 <br /> What a Community Can Control <br /> 1. Actual Need(How do you know that the tower or facility is really needed?) <br /> 2. Location(Preferred locations versus least preferred locations) <br /> 3. Height(Does it really have to be as tall as the service provider says?) <br /> 4. Visibility <br /> 5. Required Co-location of Facilities (to minimize the number of towers) <br /> 6. Number of Sites in the Community <br /> 7. Application Fees <br /> 8. Revenue(Different than fees) <br /> 9. Expert Assistance Paid for by Applicant <br /> 10. Certification of FCC Emission Standards <br /> 11. Aesthetics <br /> 12. Lighting <br /> 13. Required Setback <br /> 14. Signage <br /> 15. Screening <br /> 16. Structural Integrity/Adequacy <br /> 17. Site Security <br /> 18. Utilities (Underground versus Aerial) <br /> 19. Removal Bond <br /> 20. Indemnification <br /> 21. Insurance <br /> 22. Interference <br />