Browse
Search
Agenda - 03-22-2012 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-22-2012 - Regular Mtg.
>
Agenda - 03-22-2012 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2012 4:23:18 PM
Creation date
3/16/2012 4:23:15 PM
Metadata
Fields
Template:
BOCC
Date
3/22/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
2012-087 EMS - Solutions for Local Government Inc for Comprehensive Assessment of EMS & 911 Communications
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 03-22-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
View images
View plain text
15 <br />Orange County, North Carolina <br />Communications Center Operations Assessment <br />3.4 Performance expectations/criteria <br />4. Management Review Meet w/principal personnel individually to receive <br />input/comment/critique with regards to study findings <br />^ County Manager and/or his designated representative <br />^ Communications Center Supervisor(s) <br />4.1 Address questions raised <br />4.2 Pursue follow-up data review/analysis and/or research <br />as required <br />4.3 Include findings and/or edits in draft report if/as <br />appropriate <br />5. Final Report Preparefinal report document <br />^ Narrative w/accompanying diagrams and graphics <br />^ Print and bind all copies <br />^ Deliver report documents to County <br />6. Formal Presentation At such time as requested by the County, will be available to <br />the Board of Commissioners to provide formal presentation <br />of report findings & recommendations <br />Deliverables <br />1. On-site time, as required, to collect and assess the information necessary to address the <br />study tasks identified; estimate minimum of 3-4 days. <br />2. Coordination and facilitation of all project related meetings and interviews as referenced in <br />the Work Plan Outline. <br />3. Participation in and presentation of draft report information for management level review, <br />with principal County, and Communications Center personnel. <br />4. Formal presentation of findings and recommendations to the Board of County <br />Commissioners, at such time as determined by the County. <br />5. Development, production, and delivery of eight (S) copies of the completed study document <br />to Orange County. <br />6. Final report, including copies of all presentation materials will also be provided to the <br />County in electronic (CD) format. <br />Fees <br />The costs that make up the proposed fee are based on: <br />• Man-hours; both on-site and "in-office", and <br />^ Project related expenses for travel, per diem, communications, materials preparation, <br />and document production. <br />Sotutions for local Csovemmenf, 3nc. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).