Orange County NC Website
I <br /> __. _. _..._ .... . __ _.._ _ <br /> _... _... . ... ............ <br /> 4 <br /> ' negatively impacted local residents. : <br /> ! Section 5.10.2 of the UDO enables Orange County to develop and adopt a Master ' <br /> �' Telecommunications Plan Map (hereafter `Plan') in an effort to address these ' <br /> deficiencies. <br /> ; The purpose of the Plan is to display properties where owners have expressed ���',' <br /> ! interest in allowing wireless telecommunication facilities to be constructed. The <br /> ' BOCC first reviewed the Plan at its February 29, 2011 Joint Quarterly Public Hearing ; <br /> and adopted it subsequently. „ <br /> According to Sub-section 5.10.2(D)(2) of the UDO, additions or modifications to the ' <br /> Plan are reviewed annually, as warranted, by the BOCC at the February Quarterly ; <br /> ' Public Hearing. Applications to add to withdraw from or otherwise modify the Plan <br /> ' are required to be filed with the Planning Director prior to December 1St of each year. ' <br /> ' The need for public safety, wireless broadband, and information technology <br /> ' connectivity continues to be in high demand. <br /> Adoption, or subsequent modification, of the Plan does not include approval of a <br /> ' specific cell tower development project. Rather, the Plan in conjunction with the <br /> guidelines found in Section 5.10.6 of the UDO provides an administrative mechanism ; <br /> ' to encourage cell tower providers to work as partners to improve broadband and ' <br /> '; emergency service in the rural portions of the County. <br /> ; Telecommunication support structures are still required to adhere to the various <br /> ' development standards detailed within Section 5.10.8 of the UDO. This includes : <br /> ' adherence to the following requirements: ; <br /> a. Development of a site plan denoting the location of the proposed tower, ' <br /> ', setback distances, fall zone requirements, etc, ; <br /> b. A landscape plan denoting the planting of require foliage for the tower, <br /> c. Draft bond agreements for the project, ' <br /> d. Data concerning possible environmental impact, and <br /> e. All other required documentation detailed within the UDO. ', <br /> Further, all telecommunication support structures located on County property are ' <br /> required to adhere to initial notification and testing requirements, including the ' <br /> ' holding of a properly advertised balloon test, the completion of an Environmental ' <br /> ; Assessment, and the holding of a neighborhood information meeting to inform local <br /> ': residents of the pending application. <br /> 2. Analvsis <br /> ..._.._......................._......_.........._.............._....._..___..._.......__......_........__...____..______._._.__.............._.................._._ .............._....._._.__....____.._.. ..__.._.._.......... .._....__. _..__.._... ...........__..._..._..._.._____, <br /> ' The Plan essentially serves as a marketing tool to allow the County to provide some : <br /> ' direction on where available properties, suitable for the development of wireless support <br /> ' structures, are located. Available properties include those where existing property <br /> ! owners have expressed formal, written, interest in allowing for the development of a <br /> ' wireless support structure. <br /> 2 <br />