Orange County NC Website
i~~~~~~1-~~i~~~~~iinin~i i iiii«iiii~ ~ i~i <br />R85227 465 33/34 <br />Article 7: SubdivSsions <br />Section 7.8: Access and Roadways <br />(1) Private road construcGon must be inspected and the construction certified in <br />writing to the Orange Counry Planning Department by a North Carolina <br />Professional Engineer. <br />(2) The location of the travelway within the right-of-way must be certified to be within <br />the platted private road right-of-way by a North Carolina Registered Land <br />Surveyor. <br />(3) The road must be inspected during construction so that any changes or <br />improvements necessary to insure approval can be made before the sto is <br />placed and the shoulders and ditches are seeded and muiched. <br />(4) The subdivider or his(her representative must inform the professional ma ' e <br />certification prior to the start of construction and at intervals during constructi <br />when inspections are needed so that they can be scheduled.^ <br />Professional Engineer Road Construction Certification No es <br />Re uired <br />Surveyor Certification Roadway in Platted Right-of- Yes Yes <br />Wa <br />(5) Inspections by the Planning Departrnent a ade only to i ure the following: <br />(a) That the road is built to the e uired ' sions; <br />(b) That the stone travelw is pr i to t width; <br />(c) That adequate drai e is provide • <br />(d} That any disturb as a eded a ulched to establish <br />permanent ve e ati <br />(e) To verify t e equire r si n is in place. <br />(6) The subdivider ' pons for sup ' ng construction and for quality control <br />inspections fo ri bbing the right-of-way, compaction of fill, <br />construction materia a so forth. <br />(7) The su r res a' hould employ a qualified grading contractor <br />(and ervisor i c sary insure that the road is in the correct location and <br />that eptable meth d an materials are used. <br />(8) ~ o etters of cre i cannot be released or reduced until completion of the <br />d is r ed_ Arra ements for payment between the subdivider and <br />c ctor e responsibility of Orange County. <br />7.8.6 Alfeys <br />(A) AI shall be re ' d for lots used for commercial and industrial purposes except that <br />~this r ' ement may be waived where other definite and assured provision is made for <br />(B) Af~shall f}6t be provided in residential subdivisions unless necessitated by unusual <br />The h of an alley shall be adequate for the purpose which it serVes. <br />(D) e end alleys shall be avoided where possible, but if unavoidable, shall be provided <br />with adequate tum around facilities at the dead end as may be recommended by the <br />Planning Board and approved by the Board of County Commissioners. <br />Orange County, North Carolina - Unified Development Ordinance Page 7-26 <br />