Browse
Search
Agenda - 03-13-2012 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-13-2012 - Regular Mtg.
>
Agenda - 03-13-2012 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 1:28:21 PM
Creation date
3/9/2012 3:32:39 PM
Metadata
Fields
Template:
BOCC
Date
3/13/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 03-13-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC 54 J I-40 CORRIDOR STUDY <br /> TRANSPORTATION-LAND USE MASTER PLAN <br /> .�.� <br /> Description Location Jurisdiction Phase Cost' <br /> Implement superstreet configuration at Meadowmont Ln/Friday Chapel Hill Mid-Term $4,300,000 <br /> Meadowmont Ln/Friday Center Dr. Center Dr& NC 54 (2020-2025) <br /> Construct Barbee Chapel RdgGrade Barbee Chapel Rd & NC Chapel Hill Mid-Term $9,200,000 <br /> separation. 54 (2020-2025) <br /> Construct partial cloverleaf redesign of US US 15-501& NC 54 Chapel Hill Long Term $17,300,000 <br /> 15-501 interchange. interchange (2025-2035) <br /> Implement superstreet configurations at W NC 54 intersections with Chapel Hill Long Term $4,900,000 <br /> Barbee Chapel Rd and Burning Tree Dr/ W Barbee Chapel Rd and (2025-2035) <br /> Finley Golf Course Rd. Burning Tree Dr/Finley <br /> Golf Course Rd <br /> i <br /> I <br /> 1 Cost estimates do not include right-of-way,utilities or escalation. <br /> 2 Cost estimates include fourth travel lane on eastbound 1-40 to bridge across creek prior to NC 751 interchange.Recommended to extend travel lane to NC <br /> 751 interchange. <br /> 3 Cost estimates do not include right-of-way damages. <br /> 4 Cost estimate extends from 1-40 ramps to Leigh Farm Rd/Quadrangle Dr. <br /> 5 Crossland Drive refers to the future western collector street. Throughout the study process,public citizens raised concerns over the Crossland Drive alignment <br /> and proposed George King as a future collector street. The superstreet configuration is recommended for whichever road alignment becomes the collector <br /> street. <br /> DECEMBER 2011 E-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.