Browse
Search
Agenda - 03-13-2012 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-13-2012 - Regular Mtg.
>
Agenda - 03-13-2012 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 1:28:21 PM
Creation date
3/9/2012 3:32:39 PM
Metadata
Fields
Template:
BOCC
Date
3/13/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 03-13-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC 54/ I-40 CORRIDOR STUDY EXECUTIVE SUMMARY <br /> TRANSPORTATION-LAND USE MASTER PLAN <br /> ROADWAY <br /> Description Location Jurisdiction Phase Cost' <br /> Construct Farrington Rd slip ramp for Farrington Rd Durham Short Term $3,400,000 <br /> northbound traffic on Farrington Rd to (2012-2020) <br /> access eastbound I-40 directly.Modify <br /> on-ramp to allow for transition. <br /> Construct collector street system including As specified in the adopted Durham Short Term $31,400,000 <br /> turn lanes on NC 54. Southwest Durham (2012-2020) <br /> —Southeast Chapel Hill <br /> Collector Street Plan <br /> Construct access road behind the Between Farrington Rd and Durham Short Term $400,000 <br /> Farrington Road shopping center for Falconbridge Rd (2012-2020) <br /> connection between Farrington Rd and <br /> Falconbridge Rd. <br /> Obtain Marriot Way,then upgrade to Between Friday Center Dr Chapel Hill Short Term $800,000 <br /> NCDOT standards and extend to Barbee and E Barbee Chapel Rd (2012-2020) <br /> Chapel Rd. <br /> Construct other connections as Through study area Durham& Short to Long Variable cost <br /> opportunities arise through development Chapel Hill Term <br /> proposals. <br /> Close Glenwood Square shopping center Glenwood Square Shopping Chapel Hill Short Term $100,0003 <br /> driveways along NC 54 and provide Center at US 15-501 (2012-2020) <br /> access via Hamilton Rd interchange <br /> Construct dual exit lanes for 1-40 WB 1-40 Interchange with NC 54 Durham Mid-Term $6,100,0004 <br /> to NC 54 WB loop ramp plus two thru (2020-2025) <br /> lanes on NC 54 WB. Widen bridge for <br /> four EB lanes,three WB lanes,and 10- <br /> foot sidewalk on south side. <br /> Add new partial cloverleaf ramp for 1-40 Interchange with NC 54 Durham Mid-Term S2,100,000 <br /> 1-40 EB to NC 54 EB,remove existing (2020-2025) <br /> signal and install yield sign at the 1-40 <br /> EB to NC 54 WB ramp. Reconfigure EB <br /> approach at 1-40 EB on-ramps for two <br /> free-flow lanes to EB 1-40. <br /> Widen NC 54 to six lanes east of Barbee Chapel Rd to 1-40 Durham Mid-Term $22,700,000 <br /> Barbee Chapel Rd to match six lane Interchange (2020-2025) <br /> section to the west.Construct the multiuse <br /> path concurrent with the road project. <br /> Implement superstreet configuration at Future western collector Durham Mid-Term $3,900,000 <br /> Crossland Drive. street' & NC 54 (2020-2025) <br /> Convert Farrington Rd intersection to an Farrington Rd at NC 54 Durham Mid-Term $6,500,000 <br /> overpass over NC 54 with pedestrian (2020-2025) <br /> facilities. <br /> Convert Falconbridge Rd intersection Falconbridge Rd at NC 54 Durham Mid-Term $9,800,000 <br /> to a grade separated interchange with (2020-2025) <br /> pedestrian facilities. <br /> DECEMBER 2011 E-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.