Browse
Search
Agenda - 03-13-2012 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-13-2012 - Regular Mtg.
>
Agenda - 03-13-2012 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 1:28:21 PM
Creation date
3/9/2012 3:32:39 PM
Metadata
Fields
Template:
BOCC
Date
3/13/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 03-13-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC 54/ I-40 CORRIDOR STUDY <br /> TRANSPORTATION-LAND USE MASTER PLAN <br /> PEDESTRIAN AND BICYCLE <br /> Description Location Jurisdiction Phase Cost' <br /> Ensure adequate facilities for Farrington Road through Durham Short Term Variable cost. <br /> pedestrians and cyclists are available. the study area (Old Chapel (2012-2020) Paving five-foot <br /> Provide a 5-foot wide bicycle lane Hill Rd to Stagecoach Rd) wide bike lanes <br /> where possible,or provide "share the on both sides <br /> Ephesus Church Rd from Durham & Short Term <br /> road" signage and a paved shoulder or Farrington Rd to E Franklin Chapel Hill (2012-2020) of the roadway <br /> sharrow markings for on-road bicycle St would cost <br /> travel.Many of the collector streets are approximately <br /> designed with for low vehicular speeds George King Rd & Durham Short Term $1,200,000 per <br /> with the intent for bicycles to share the Crossland Dr(proposed (2012-2020) lane assuming <br /> travel lane. Fill in sidewalk gaps.s collector street)from medium duty <br /> Ephesus Church Rd to NC pavement. <br /> 54 Striping a bike <br /> lane without <br /> SW Durham Dr from Durham & Short Term paving would cost <br /> Ephesus Church Rd to NC Chapel Hill (2012-2020) approximately <br /> 54 $5,000 per mile. <br /> Lancaster Dr and E/W Durham& Short Term Installing signage <br /> collector street from Chapel Hill (2012-2020) would cost about <br /> Farrington Rd to Pinehurst $1,500 per <br /> Dr sign. Installing <br /> sidewalks would <br /> Pinehurst Dr from Ephesus Chapel Hill Short Term cost about <br /> Church Rd to Burning Tree (2012-2020) $265,000 per <br /> Dr mile. <br /> Burning Tree Dr from Chapel Hill Short Term <br /> Pinehurst Dr to NC 54 (2012-2020) <br /> Hamilton Rd from NC 54 to Chapel Hill Short Term <br /> Cleland Dr (2012-2020) <br /> Cleland Dr from Burning Chapel Hill Short Term <br /> Tree Dr to US 15-501 (2012-2020) <br /> Construct Little Creek Trail to connect Meadowmont Trail at Chapel Hill Short Term TBD <br /> Meadowmont Trail to Lancaster Drive. Rashkis Elementary School (2012-2020) <br /> Widen the existing bicycle path to a 15- Along the east side of US Chapel Hill Short Term TBD <br /> foot wide shared use path. 15-501 from Cleland Rd to (2012-2020) <br /> S Estes Dr <br /> Construct the Bolin Creek Greenway Bolin Creek Greenway Chapel Hill Short Term TBD <br /> connection to Pinehurst Dr. (2012-2020) <br /> DECEMBER 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.