Browse
Search
Agenda - 03-13-2012 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-13-2012 - Regular Mtg.
>
Agenda - 03-13-2012 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 1:28:21 PM
Creation date
3/9/2012 3:32:39 PM
Metadata
Fields
Template:
BOCC
Date
3/13/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 03-13-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC 54/ I-40 CORRIDOR STUDY <br /> TRANSPORTATION-LAND USE MASTER PLAN L EXECUTIVE SUMMARY <br /> PEDESTRIAN • BICYCLE <br /> Description Location Jurisdiction Phase Cost' <br /> Install crosswalks and Burning Tree Dr/Finley Golf Chapel Hill Short Term (2012- $80,000 <br /> pedestrian signals at Course Rd& NC 54 2020) <br /> signalized intersections with <br /> pedestrian refuge islands and W Barbee Chapel Rd&NC Chapel Hill Short Term (2012- <br /> street lighting for crossing NC 54 2020) <br /> 54.2 <br /> Meadowmont Ln/ Friday Chapel Hill Short Term (2012- <br /> Center Dr& NC 54 2020) <br /> i <br /> E Barbee Chapel Rd & NC 54 Chapel Hill Short Term (2012- <br /> 2020) <br /> Huntingridge Rd & NC 54 Durham Short Term (2012- <br /> 2020) <br /> Farrington Road (northern, Durham Short Term (2012- <br /> southern and eastern 2020) <br /> approaches) & NC 54 <br /> Leigh Farm Rd/Quadrangle Durham Short Term (2012- <br /> Dr& NC 54 2020) <br /> Install crosswalks with US 15-501 on/off ramps Chapel Hill Short Term (2012- $40,000 <br /> pedestrian-activated flashers 2020) <br /> and expand refuge islands. <br /> Extend the solid marking From SIB US 15-501 on ramp Chapel Hill Short Term (2012- $2,700,000 <br /> designating the westbound to 500 feet to the east 2020) <br /> exclusive right turn lane for <br /> US 15-501 on—ramps to <br /> minimize weaving movements <br /> at interchange and increase <br /> safety for on-road bicyclists. <br /> Provide a minimum 5-foot NC 54 from Burning Tree Dr/ Chapel Hill Short Term (2012- <br /> wide on-road bicycle lane Finley Golf Course Rd to the 2020) <br /> by restriping travel lanes to west <br /> be 1 1 feet wide and making <br /> minor median modifications. <br /> Modify sloped abutment NC 54 underneath US 15-501 Chapel Hill Short Term (2012- <br /> wall to provide 8-foot wide overpass 2020) <br /> sidewalk behind overpass <br /> structural piers. <br /> Pave road shoulders to From NC 54 to the American Durham Short Term (2012- $4,000,000 <br /> accommodate bicyclists Tobacco Trail via Barbee 2020) <br /> on select roads to provide Chapel Rd,Farrington Rd, <br /> connections to the American Stagecoach Rd, NC 751, and <br /> Tobacco Trail. Massey Chapel Rd <br /> DECEMBER 2011 E-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.