Browse
Search
Agenda - 03-13-2012 - 5l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 03-13-2012 - Regular Mtg.
>
Agenda - 03-13-2012 - 5l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 10:55:53 AM
Creation date
3/9/2012 3:25:14 PM
Metadata
Fields
Template:
BOCC
Date
3/13/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5l
Document Relationships
Minutes 03-13-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
RES-2012-028 Resolution Approving Application for a Clean Water State Revolving Fund Loan to Finance the Proposed McGowan Outfall
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Carolina WaterlWastewater Common Application Form <br />PROJECT BUDGET <br />For use by ARC, CWMTF, DENR, DOC, and Rural Center applicants. <br />Complete the project budget addressing the categories provided In the table below (insert rows/columns as needed). <br />NOTE: Engineering costs shall be held to the USDA or EPA fee curve, depending on the funding partner. <br />Page 4 of 5 <br />Version 09/10 <br />J <br />ARC <br />CWMTF <br />DENR <br />DOC <br />Rural Center <br />Local <br />Other <br />Total Cost Amount <br />Cost Description <br />Construction costs should be <br />indicated by line item. <br />Example: linear feet of <br />different sized lines <br />McGowan Creek Interceptor <br />L <br />490,000 <br />$0.00 <br />$490,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Construction Sub -Total <br />$0.00 <br />$0.00 <br />$490,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$490,000.00 <br />Contingency <br />49000 <br />$49,000.00 <br />Engineering Design <br />55000 <br />$55,000.00 <br />Permitting <br />1450 <br />$1,450.00 <br />Land Surveying Costs <br />15000 <br />$15,000.00 <br />Easement Preparation <br />55000 <br />$55,000.00 <br />Closing Fee (if applicable) <br />Construction <br />$0.00 <br />Administration /Observation <br />35000 <br />$35,000.00 <br />Grant and /or Loan <br />Administration <br />15000 <br />$15,000.00 <br />Legal Costs <br />40000 <br />$40,000.OQ <br />Other (specify) <br />Administration Sub -Total <br />$0.00 <br />$0.00 <br />$265,450.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$265,450.00 <br />TOTAL PROJECT COST <br />$0.00 <br />$0.00 <br />$765,450.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$755,450.00 <br />Status of Funding <br />(pending or secured) <br />Page 4 of 5 <br />Version 09/10 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.