Orange County NC Website
North Carolina WaterlWastewater Common Application Form <br />PROJECT BUDGET <br />For use by ARC, CWMTF, DENR, DOC, and Rural Center applicants. <br />Complete the project budget addressing the categories provided In the table below (insert rows/columns as needed). <br />NOTE: Engineering costs shall be held to the USDA or EPA fee curve, depending on the funding partner. <br />Page 4 of 5 <br />Version 09/10 <br />J <br />ARC <br />CWMTF <br />DENR <br />DOC <br />Rural Center <br />Local <br />Other <br />Total Cost Amount <br />Cost Description <br />Construction costs should be <br />indicated by line item. <br />Example: linear feet of <br />different sized lines <br />McGowan Creek Interceptor <br />L <br />490,000 <br />$0.00 <br />$490,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Construction Sub -Total <br />$0.00 <br />$0.00 <br />$490,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$490,000.00 <br />Contingency <br />49000 <br />$49,000.00 <br />Engineering Design <br />55000 <br />$55,000.00 <br />Permitting <br />1450 <br />$1,450.00 <br />Land Surveying Costs <br />15000 <br />$15,000.00 <br />Easement Preparation <br />55000 <br />$55,000.00 <br />Closing Fee (if applicable) <br />Construction <br />$0.00 <br />Administration /Observation <br />35000 <br />$35,000.00 <br />Grant and /or Loan <br />Administration <br />15000 <br />$15,000.00 <br />Legal Costs <br />40000 <br />$40,000.OQ <br />Other (specify) <br />Administration Sub -Total <br />$0.00 <br />$0.00 <br />$265,450.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$265,450.00 <br />TOTAL PROJECT COST <br />$0.00 <br />$0.00 <br />$765,450.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$755,450.00 <br />Status of Funding <br />(pending or secured) <br />Page 4 of 5 <br />Version 09/10 <br />J <br />