Orange County NC Website
14 <br />CWSRF fntegrated Priority Rating System <br />For aii CWSRF Project ~ <br /> Max <br /> Total <br /> (Pofnts are given for only ane type of project per fundin,q applicatian) Roints Points <br /> <br />Line 3p <br />Item # Project Type <br /> WAS7EWATER TRFATMENT AND COLLECTION SYSTEM PRUdEC75 <br />1 {NW7'P - New construction or expansian projects 5 <br /> The WWTP is a majorfacility in a Tier3 county: <br /> 1. Does the applicant have a reclaimed water system that is activefy distributing <br /> >100,400 gpd? YES NO (Circle Onej _~ <br />1.1 z. ~i~l the project incfude reclaimed waterthat will use 10Q,OU0 gpd (must have <br /> camrnitment letters from users)? YES 3V0 (Circle One) ' <br /> Subtract 2 points if answered "no" to both questions. <br /> If answered "no" to botFs questions in ~ine Item 1.1 then: <br /> i. ts the WWTP approved for recfaimed water distribution? YES NO <br />-z <br />~ 2 2. Wili the project incfude meeting redaimed water sEandards? YES NO ~ <br /> Subtract 2 points if answered "no" to bath questions. <br /> WWTP REPEACEMEN7/REHABILlTATION that would not increase service area ~5 <br />2 <br />capacity I <br />~ <br />2.1 Replacing WWTP infrastructure that is greater than 20 years old 5 ' <br /> NEW SEWEIt LIRIE EX7'EfVS10N that primarily serves areas with failing septic tanks <br />3 (must provide a letter from the Health Department), singte-fatniEy residence 20 <br /> discharges {NCGS5Q000), or single-fami[y residence spray / drip irrigation systems <br />4 IXPAiVStON OF ~(15i'IMG SEWER I.INES ~ ~ <br /> COLLECTIOM SYSTEM REPlACEMEMT/REHABILlTATtON (pump station/force <br />20 <br />~ main/gravity sewer} that waufd not increase capacity 20 <br />5.1 Addresses in€iltrationJinflow (1/I) for a sewershed based on a SSES ~ 3 <br />5.2 Addresses reported sanitary sewer overflows (SSOs) 2 <br />5.3 Replaces sewer infrastructure that is greater than 40 years ald 5 <br /> GRE~N PROJEGTS ' <br />6 STREAM RESTORATtON project (includes wetlands) 1~ <br />6.1 Stream restoration project that restores the natural hydrology of the watershed 10 <br /> Stream restoration projectthat includes protection of riparian buffers beyond 5 <br />6 2 rule requirements <br />7 STORMWQTER project that addresses treating existing sources of pollution 15 <br /> Starmwater praject that includes infittration BMPs as specified in the f~C BMP <br />7.1 stormwater manual or BMPs in series that achieve at least 35% nutrient 20 <br /> reductian (both TN and TP) and 85~ TSS reduction <br />8 RECIAtMED WATER pro}ect where no reclaimed water system exists 15 <br /> RECLA[MED VIlA'FER project where an existing reclaimed water system is being 1~ <br />g expanded <br /> EiVERGY EFFtCIENCY project at a WUVTP or ather wastewater infrastructure strictiy ~ <br />1~ to achieve a minimum 204o energy reduction <br />CWSRF Integrated Priority Rating System Sheet Mcgowau Creek Itrterceptor.Doc Page 7 of 8 <br />