Browse
Search
2012-056 AMS - FloorChem Inc Flooring removan & replacement of Jail Kitchen renovation $6348
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-056 AMS - FloorChem Inc Flooring removan & replacement of Jail Kitchen renovation $6348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:54:55 PM
Creation date
3/7/2012 3:18:25 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
2012-056 AMPS and FloorChem Inc $6,348
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FloorChem, Inc. 200 Powell Drive <br />E -mail - floorchem @aol.com Suite 103 <br />www.floorchem.com Raleigh, NC 27606 <br />"A NC WBE Company" Phone: 919 - 854 -9776 <br />October 14, 2011 <br />RE: Orange Co Jail — Kitchen Flooring <br />The following is a proposal for installing the flooring in the above facility. Specifications are as <br />follows: <br />Owner to: <br />1. Disconnect equipment and move from space <br />2. Remove dry goods from pantry area and wares from kitchen as needed <br />F1oorChem, Inc. to: <br />Clad Floor — nominal ' /a" trowel down floor system <br />1. Remove existing VCT and clean metal grate over grease trap <br />2. Diamond grind floors to remove VCT glue, clean and profile for new coatings <br />3. Vacuum clean to remove dust and debris <br />4. Repair joints and/or cracks with flexible joint filler, membrane as needed <br />5. Install 4" cove base on wall perimeter with termination strips on top of base <br />6. Apply trowel mix coat at a nom. 3/16" thick of "ucrete" urethane /concrete /aggregate blend <br />7. Install full broadcast coat at a nominal 1/16" thick for a consistent finish while "ucrete" is <br />still wet <br />8. Apply grout / seal coat of high solids clear urethane <br />9. Apply top /seal coat of high solids clear urethane for a non slip finish <br />Price quote for above will be $ 6,348.00 <br />Special Notes Please Read <br />Conditions <br />► Floors must cure for 24 hours before any equipment, furniture and 48 hours for automobile traffic is <br />moved back on to the floors. This is very important and if not followed, will void warranty. <br />► Site will need adequate lighting for floors to be installed. This should be the same lighting when <br />floor is to be inspected. Also adequate power will be needed to operate certain equipment. <br />► If work is performed in cold weather, then slab must be a minimum of 55° F at installation. <br />► If removal of existing floor covering, such as carpet, vinyl or ceramic tile, is required, then the <br />owner or GC is responsible for supplying a dumpster for disposal of such materials. <br />Warranties <br />► Workmanship will be guaranteed for one (1) year after date of completion on all floors. <br />Terms <br />► Payment terms are net 20 please, upon completion of work. Service charges will apply to past due <br />invoices. Excessive delay of payment will void all warranties. <br />If further information is needed, please do not hesitate to call on me. <br />Respectfully Submitted, <br />Arita M. Brack <br />Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.