Orange County NC Website
I <br /> NC 54/ I-40 CORRIDOR STUDY EXECUTIVE SUMMARY <br /> TRANSPORTATION-LAND USE MASTER PLAN <br /> ROADWAY <br /> Description Location Jurisdiction Phase Cost' <br /> Construct Farrington Rd slip ramp for Farrington Rd Durham Short Term $3,400,000 <br /> northbound traffic on Farrington Rd to (2012-2020) <br /> access eastbound 1-40 directly.Modify <br /> on-ramp to allow for transition. <br /> Construct collector street system including As specified in the adopted Durham Short Term $31,400,000 <br /> turn lanes on NC 54. Southwest Durham (2012-2020) <br /> —Southeast Chapel Hill <br /> Collector Street Plan <br /> Construct access road behind the Between Farrington Rd and Durham Short Term $400,000 <br /> Farrington Road shopping center for Falconbridge Rd (2012-2020) <br /> connection between Farrington Rd and <br /> Falconbridge Rd. <br /> Obtain Marriot Way,then upgrade to Between Friday Center Dr Chapel Hill Short Term $800,000 <br /> NCDOT standards and extend to Barbee and E Barbee Chapel Rd (2012-2020) <br /> Chapel Rd. <br /> Construct other connections as Through study area Durham& Short to Long Variable cost <br /> opportunities arise through development Chapel Hill Term <br /> proposals. <br /> Close Glenwood Square shopping center Glenwood Square Shopping Chapel Hill Short Term $100,0003 <br /> driveways along NC 54 and provide Center at US 15-501 (2012-2020) <br /> access via Hamilton Rd interchange <br /> Construct dual exit lanes for 1-40 WB 1-40 Interchange with NC 54 Durham Mid-Term $6,100,000" <br /> to NC 54 WB loop ramp plus two thru (2020-2025) <br /> lanes on NC 54 WB. Widen bridge for <br /> four EB lanes,three WB lanes,and 10- <br /> foot sidewalk on south side. <br /> Add new partial cloverleaf ramp for 1-40 Interchange with NC 54 Durham Mid-Term $2,100,000 <br /> 1-40 EB to NC 54 EB, remove existing (2020-2025) <br /> signal and install yield sign at the 1-40 <br /> EB to NC 54 WB ramp. Reconfigure EB <br /> approach at 1-40 EB on-ramps for two <br /> free-flow lanes to EB 1-40. <br /> Widen NC 54 to six lanes east of Barbee Chapel Rd to 1-40 Durham Mid-Term $22,700,000 <br /> Barbee Chapel Rd to match six lane Interchange (2020-2025) <br /> section to the west.Construct the multiuse <br /> path concurrent with the road project. <br /> Implement superstreet configuration at Future western collector Durham Mid-Term $3,900,000 <br /> Crossland Drive. streets & NC 54 (2020-2025) <br /> Convert Farrington Rd intersection to an Farrington Rd at NC 54 Durham Mid-Term $6,500,000 <br /> overpass over NC 54 with pedestrian (2020-2025) <br /> facilities. <br /> Convert Falconbridge Rd intersection Falconbridge Rd at NC 54 Durham Mid-Term $9,800,000 <br /> to a grade separated interchange with (2020-2025) <br /> pedestrian facilities. <br /> DECEMBER 2011 E-1 <br />