Orange County NC Website
NC 54/ I-40 CORRIDOR STUDY EXECUTIVE SUMMARY <br /> TRANSPORTATION-LAND USE MASTER PLAN <br /> PEDESTRIAN AND BICYCLE <br /> Description Location Jurisdiction Phase Cost' <br /> Ensure adequate facilities for Farrington Road through Durham Short Term Variable cost. <br /> pedestrians and cyclists are available. the study area (Old Chapel (2012-2020) Paving five-foot <br /> Provide a 5-foot wide bicycle lane Hill Rd to Stagecoach Rd) wide bike lanes <br /> where possible,or provide "share the Ephesus Church Rd from Durham & Short Term on both sides <br /> road" signage and a paved shoulder or Farrington Rd to E Franklin Chapel Hill (2012-2020) of the roadway <br /> sharrow markings for on-road bicycle would cost <br /> travel.Many of the collector streets are St approximately <br /> designed with for low vehicular speeds George King Rd & Durham Short Term $1,200,000 per <br /> with the intent for bicycles to share the Crossland Dr(proposed (2012-2020) lane assuming <br /> travel lane. Fill in sidewalk gaps.3 collector street) from medium duty <br /> Ephesus Church Rd to NC pavement. <br /> 54 Striping a bike <br /> lane without <br /> SW Durham Dr from Durham & Short Term paving would cost <br /> Ephesus Church Rd to NC Chapel Hill (2012-2020) approximately <br /> 54 $5,000 per mile. <br /> Lancaster Dr and E/W Durham & Short Term Installing signag <br /> collector street from Chapel Hill (2012-2020) would cost about <br /> ton Rd to Pinehurst $1,500 n. In per <br /> Farrington sign. Installing <br /> Dr sidewalks would <br /> Pinehurst Dr from Ephesus Chapel Hill Short Term cost about <br /> Church Rd to Burning Tree (2012-2020) $265,000 per <br /> Dr mile. <br /> Burning Tree Dr from Chapel Hill Short Term <br /> Pinehurst Dr to NC 54 (2012-2020) <br /> Hamilton Rd from NC 54 to Chapel Hill Short Term <br /> Cleland Dr (2012-2020) <br /> Cleland Dr from Burning Chapel Hill Short Term <br /> Tree Dr to US 15-501 (2012-2020) <br /> Construct Little Creek Trail to connect Meadowmont Trail at Chapel Hill Short Term TBD <br /> Meadowmont Trail to Lancaster Drive. Rashkis Elementary School (2012-2020) <br /> Widen the existing bicycle path to a 15- Along the east side of US Chapel Hill Short Term TBD <br /> foot wide shared use path. 15-501 from Cleland Rd to (2012-2020) <br /> S Estes Dr <br /> Construct the Bolin Creek Greenway Bolin Creek Greenway Chapel Hill Short Term TBD <br /> connection to Pinehurst Dr. (2012-2020) <br /> DECEMBER 2011 E-11 <br />