Browse
Search
Agenda - 02-21-2012 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-21-2012 - Regular Mtg.
>
Agenda - 02-21-2012 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:52:30 AM
Creation date
2/17/2012 2:49:13 PM
Metadata
Fields
Template:
BOCC
Date
2/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes 02-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: February 21, 2012 <br />SUBJECT: NC 54/1 -40 Corridor Study <br />DEPARTMENT: Planning and Inspections <br />ATTACHMENT(S): <br />1. Corridor Study Table of Contents <br />2. Corridor Study Executive Summary <br />3. Copy of PowerPoint Presentation <br />Action Agenda <br />Item No. Lq - Q <br />PUBLIC HEARING: (Y /N) No <br />INFORMATION CONTACT: <br />Craig Benedict, 245 -2592 <br />Tom Altieri, 245 -2579 <br />Darcy Zorio, 245 -2582 <br />PURPOSE: To receive a presentation from Durham - Chapel Hill - Carrboro (DCHC) <br />Metropolitan Planning Organization (MPO) staff (Leta Huntsinger) on the NC54/1 -40 Corridor <br />Study. <br />BACKGROUND: <br />What is the purpose of the study? <br />The purpose of the study is to analyze short-term and long -term land use issues and multi - <br />modal transportation problems, evaluate opportunities and challenges, and recommend short <br />and long -range land use and transportation solutions and strategies along the corridor. <br />Why is this study important? <br />The NC 54 corridor serves as one of the major gateways between Chapel Hill and southwest <br />Durham, and its interchange with 1 -40 has consistently ranked as one of the top congested <br />locations in the region. Development pressures within the corridor coupled with mobility and <br />capacity issues have illuminated the concern that the existing and planned transportation <br />infrastructure in this area is insufficient to accommodate growth and to address land use and <br />transportation problems. Short and long -range solutions are needed to preserve this important <br />corridor. <br />What are the study objectives? <br />The vision of the DCHC MPO is to develop and implement transportation plans that are <br />multimodal and that fully integrate land use and transportation issues. To achieve this vision this <br />study will: <br />• Clearly define a realistic "blueprint" for an integrated growth and mobility strategy for the <br />corridor <br />• Establish a development framework that strengthens multimodal travel options and <br />reduces vehicle miles of travel <br />Improve operations, safety, and travel time <br />Categorize strategies into near, mid -term, and long -term phases <br />
The URL can be used to link to this page
Your browser does not support the video tag.