Orange County NC Website
63 <br />Ordinance <br />Requirements <br />5.8.4 (A) (3) (g) (iv) <br />Permanent landscaping, <br />groundcover, mulch, etc. <br />shall be installed as soon <br />as practical after <br />construction activities for <br />each phase are <br />completed. <br />5.8.4 (A) (3) (h) <br />Solid Waste Management <br />5.8.4 (A) (3) (h) (i) <br />A solid waste <br />management plan, <br />submitted as part of the <br />Resources Management <br />Plan, shall include the <br />method(s) of disposal and <br />recycling of construction <br />debris. <br />5.8.4 (A) (3) (i) <br />Irrigation <br />5.8.4 (A) (3) (i) (i) <br />Irrigation systems for the <br />school project are <br />designed and can be <br />operated according to a <br />water conservation plan <br />described in the <br />Resources Management <br />Plan submitted with the <br />application; <br />PLANNING <br />BOARD EVIDENCE SUBMITTED <br />RECOMMENDED TO SUPPORT <br />FINDINGS FINDINGS <br />Yes X No _ The site plan package <br /> contains several notes <br /> indicating compliance <br /> with this provision <br />X Yes No A solid waste <br />management plan was <br />submitted to Orange <br />County for review. \ <br />Yes X No _ The site plan package, <br />specifically Sheets C5 <br />and C6, contains the <br />required information <br />BOCC <br />FINDINGS <br />Yes _ No _ <br />_Yes No <br />Yes _ No _ <br />