Orange County NC Website
62 <br />Ordinance <br />Requirements <br />5.8.4 (A) (3) (g) <br />Grading and Erosion <br />Control <br />5.8.4 ~A) ~3) ~9) ~~) <br />Plans for grading and <br />erosion control shall <br />comply with standards <br />contained in this <br />Ordinance, the Orange <br />County Sedimentation <br />Control Manual and, if <br />applicable, The North <br />Carolina Erosion and <br />Sedimentation Control <br />Program rules; <br />PLANNING <br />BOARD <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />Yes X No _ Preliminary assessment <br /> by County Erosion <br /> Control indicates that <br /> project will comply (i.e. <br /> new driveway). <br />A condition of approval <br />on this project should be <br />that the applicant comply <br />with any required <br />conditions imposed by <br />Erosion Control as their <br />review continues. <br />BOCC <br />FINDINGS <br />Yes _ No _ <br />5.8.4 (A) (3) (g) (ii) <br />Construction shall be <br />phased to minimize <br />disturbance and <br />sedimentation; <br />5.8.4 (A) (3) (9) (iii) <br />Sediment control <br />measures shall be <br />properly installed to filter <br />sediment from runoff <br />during construction and <br />maintained until grading is <br />complete and a <br />permanent vegetative <br />cover has been <br />established and all slopes <br />stabilized; and <br />Yes X No _ The site plan package <br />contains several notes <br />indicating compliance <br />with this provision <br />Yes X No _ A condition of approval <br />on this project should be <br />that the applicant comply <br />with any required <br />conditions imposed by <br />Erosion Control as their <br />review continues. <br />Yes _ No _ <br />Yes _ No _ <br />