Browse
Search
Agenda - 02-21-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-21-2012 - Regular Mtg.
>
Agenda - 02-21-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 2:46:49 PM
Creation date
2/17/2012 2:26:02 PM
Metadata
Fields
Template:
BOCC
Date
2/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 02-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-007 An Ordinance Amending the Orange County Zoning Atlas – Carolina Friends Schools
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
ORD-2012-008 (not approved) An Ord Denying an Amendment Request to the Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61 <br />PLANNING <br />BOARD EVIDENCE SUBMITTED <br />Ordinance RECOMMENDED TO SUPPORT <br />Requirements FINDINGS FINDINGS <br />5.8.4 (A) (3) (e) <br />Stormwater Management <br />5.8.4 (A) (3) (e) (i) X Yes No Preliminary assessment <br /> by County Erosion <br />A stormwater Control indicates that the <br />management plan shall be project complies. <br />prepared and reviewed in <br />accordance with the A condition of approval <br />provisions of Section on this project should be <br />6.14 of this Ordinance. that the applicant comply <br /> with any required <br /> conditions imposed by <br /> Erosion Control as their <br /> review continues. <br />5.8.4 (A) (3) (fl Drainage <br />5.8.4 (A) (3) (fl (i) X Yes No A condition of approval <br />on this project shou~d be <br />All drainage structures will that the applicant comply <br />be installed and with any required <br />maintained according to conditions imposed by <br />the approved Stormwater Erosion Control as their <br />Management Plan. review continues. <br />5.8.4 (A) (3) (fl (ii) X Yes No A condition of approval <br />on this project should be <br />School projects that that the applicant comply <br />include structural with any required <br />stormwater measures conditions imposed by <br />shall comply with Erosion Control as their <br />Section 6.14 of this review continues. <br />Ordinance. . <br />BOCC <br />FINDINGS <br />_Yes No <br />_Yes No <br />Yes No <br />
The URL can be used to link to this page
Your browser does not support the video tag.