Browse
Search
2012-017 AMS - Warren-Hay Mechanical Contractors for Link Geothermal Well $13,080
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-017 AMS - Warren-Hay Mechanical Contractors for Link Geothermal Well $13,080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2012 4:50:46 PM
Creation date
2/13/2012 2:36:25 PM
Metadata
Fields
Template:
BOCC
Date
9/8/2011
Meeting Type
Work Session
Document Type
Contract
Agenda Item
8c mgr signed
Document Relationships
2012-017 S AMS - Warren Hay Mechanical Contractors, Inc $13,080
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i+ <br />~ ~~ <br />~Nfi1N~~Rs <br />REECE, NOLAND 8~ McELRATH, INC. <br />409 North Haywood Street • P.O. Box 540 <br />Waynesville, North Carolina 28786-0540 <br />Waynesville 828-45Cr9851 • Toll Free 822-849-0486 <br />Fax 828-456-6205 • Email rrrr; a)rnr;i:=T~in~ rs.c~~rr~ <br />CHANGE ORDER NO. 1 <br />PROJECT: John M Link, Jr. Government Services Building HVAC Renovation <br />CONTRACT FOR: Mechanical Construction <br />TO: Warren-Hay Mechanical Contractors, Inc. <br />You are directed to make the following changes in this Contract: <br />^'igr5~~_o~7 <br />cS soiz,- oa 3 <br />g_~_~olJ <br />8~ <br />Provide ABC stone as required to fill trenches back to 4" below asphalt in lower parking lot. <br />Provide trucking to remove excess soil /dirt from trenches to county site as per item #3 on addendum #2. <br />Provide ABC stone even to the top of asphalt in small upper lot and from top of hill (entrance) to the <br />small lot. <br />The original Contract Sum was $679,326 <br />Net change by previous Change Orders $0 <br />The Contract Sum prior to this Change Order was $679,326 <br />The Contract `mlot to Exceed" Sum will be increased by this Change Order $13,080* <br />T'he new Contract "Not to Exceed" Sum including this Change Order will be $692,406* <br />*Actual change order amount will be based on the unit prices below. Actual quantities hauled off and provided <br />will be verified by the engineer. <br />Unit Price for haul off and stone replacement: <br />Unit Price for stone only to fill ditch to grade <br />The Contract Time will be unchanged <br />$42.00/cubic yard 300 cu/yd estimated <br />$32.00/cubic yard 15 cu/yd estimated <br />'j? <br />Y:\Orange Co Link Geothermal 2011019.00\Correspondence\change order #1.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.