Orange County NC Website
Article 6: Development Standards <br />Section 6.7: Additional Standards for MPD -CZD 353 <br />6.7.4 Start of Construction & Extensions <br />(A) Site plans shall be approved and construction started in accordance with the timetable <br />approved with the Master Plan. If the site plan(s) have not been approved or no <br />construction has started within the stated time frames, the Master Plan becomes void and <br />of no effect. The owner can request an extension from the Board of County <br />Commissioners upon the favorable recommendation of the Planning Board, if the request <br />is received before the Master Plan expires. <br />(B) No changes shall be made to the conditions of approval with extension requests. <br />Approval of a time extension shall be based on evidence presented by the applicant <br />showing that approvals have been pursued in a timely manner, and that delays have <br />resulted from factors beyond the control of the developer. <br />6.7.5 Specific Standards for Hillsborough EDD <br />In addition to the standards and regulations for all MPD -CZ districts established in this Ordinance, <br />the standards contained herein shall apply to MPD -CZ districts in the Hillsborough Economic <br />Development District. <br />(A) Purpose and Intent <br />The purpose of the MPD -CZ in the Hillsborough Economic Development District is to <br />provide locations for a mix of residential, commercial and light industrial uses in a <br />cohesive development that is compatible with the natural terrain and surrounding uses. <br />This district encourages innovation by offering flexibility in design and layout <br />requirements to achieve a greater choice of living and working environments. <br />(B) Applicability <br />(1) The minimum size of a MPD -CZ district shall be 20 596 acres. <br />(2) This district shall only be applied where water and sewer are available at the site <br />or are to be made available to the site as part of the development approval <br />process. <br />(C) Development Standards <br />(1) Dimensional Requirements <br />(a) There are no minimum lot sizes within the MPD -CZ district; However, the <br />Master Plan will set forth the individual lot setbacks in accordance with <br />the General Dimensional Requirements established herein. <br />(b) Single - family and duplex residential uses following the flexible <br />development guidelines established in Section 7.13 of this Ordinance, <br />may reduce the minimum setbacks by 50% and the lot width by 60 %. <br />(2) internal Access <br />96 Staff is suggesting that the minimum size be reduced to 5 acres, which is the minimum size for consideration of <br />all other MPD -CZ projects. <br />Orange County, North Carolina — Unified Development Ordinance Nage 6-40 <br />