Browse
Search
Agenda - 11-21-2011 - C5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-21-2011 - Quarterly Public Hearing - Late
>
Agenda - 11-21-2011 - C5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 9:37:48 AM
Creation date
2/9/2012 4:46:00 PM
Metadata
Fields
Template:
BOCC
Date
11/21/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.5
Document Relationships
Minutes 11-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 347 <br />Section 6.4: Performance Standards <br />(c) Building and site plans which indicate the precise location and quantity of <br />hazardous materials. <br />(3) An Environmental Assessment will be required for any use or facility which <br />qualifies as a small or large generator of hazardous waste as defined by the N.C. <br />Department of Environment and Natural Resources. <br />(4) Any use or facility which is involved in the long -term storage or disposal of <br />hazardous wastes will be required to submit a full Environmental Impact <br />Statement. <br />(5) Documentation must be provided as part of the HMMP confirming the following: <br />(a) That hazardous wastes are being sent to an approved hazardous waste <br />recycling, storage, treatment or disposal facility, <br />(b) That an EPAID number has been obtained, <br />(c) That only authorized transporters are used, and <br />(d) That on -site storage is limited to 180 days (or up to 270 days if the waste <br />is to be transported more than 200 miles). <br />6.4.8 Utilities <br />(A) Economic Development Districts <br />(1) eas# Each ' permitted use, special use, and accessory use to be served by a <br />public or private water or sewer system must be: <br />(a) Designed, sized, and constructed to the standards of the utility provider; <br />and <br />(b) Assured of installation of such services at the time it is approved. <br />(2) Each MPD -CZ Master Plan and site plan must be accompanied by <br />documentation from the utility provider that it has reviewed and approved: <br />(a) Preliminary plans for the proposed water and /or sewer lines; <br />(b) The adequacy of the existing system(s) to which the connections(s) will <br />be made; <br />(c) The capacity of the existing water and sewer treatment facilities; <br />(d) The carrying capacity of the discharge stream or discharge point; and <br />(e) The method of funding proposed extensions of water and sewer lines. <br />(3) The approval by the utility provider must in the form of a resolution or other <br />agreement adopted by its board of directors or governing board and must also <br />contain a certification that service to -the development project is authorized by <br />any water management plan and discharge permit in effect at the time of . <br />approval. <br />(4) Installation <br />(a) The location and size of easements for water and /or sewer lines must be <br />approved by and dedicated in the form of a deed of easement to the <br />utility provider. <br />91 Sentences such as this were removed from the UDO during the UDO development process. This instance was <br />missed and staff is suggesting it be removed to read as shown. <br />Orange County, North Carolina — Unified Development Ordinance Page 6 -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.