Browse
Search
Agenda - 11-21-2011 - C5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-21-2011 - Quarterly Public Hearing - Late
>
Agenda - 11-21-2011 - C5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 9:37:48 AM
Creation date
2/9/2012 4:46:00 PM
Metadata
Fields
Template:
BOCC
Date
11/21/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.5
Document Relationships
Minutes 11-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards <br />Section 6.2: Lot & Building Standards 335 <br />(2) The height limits of this Ordinance may be modified upon appeal to the Board of <br />Adjustment in accordance with Section 2.10 of this Ordinance. The Board, when <br />approving an application for modification of the height limitation, may affix to that <br />approval reasonable conditions to protect the public health, safety and general <br />welfare. <br />(B) Flexible Developments <br />(1) Minimum lot area, lot width, and setback requirements as specified in Article 3 of <br />this Ordinance may be reduced for lots created as part of a Flexible Development <br />subdivision as provided in Section 7.13 of this Ordinance. <br />(C) Flag Lots <br />(1) Flag lots as defined in Article 10 are accommodated for as provided in Section <br />7.7 of this Ordinance. <br />6.2.3 Cluste <br />(A) UNIV -CA & UNIV — PW Watershed Protection Overlay Districts <br />(1) Clustering of residential lots is permitted in accordance with Section 7.12 of this <br />Ordinance. <br />(2) Each lot shall contain a minimum of one acre. <br />(B) All Other Overlay Districts <br />Clustering of residential lots is permitted in accordance with Section 7.13 of this <br />Ordinance. <br />6.2.4 Irregular Lots <br />Any irregular lot of record at the time these regulations became effective may be subdivided in <br />compliance with applicable subdivision regulations and improvement requirements, to create <br />additional regular lots, provided that such lots meet all requirements of the district and that no <br />residual substandard lots remain as a result of such action. <br />6.2.5 Principal Uses <br />There shall be no more than one principal use on any zoning lot except where: <br />(A) Permitted as a CU District or CZ District; or <br />(B) The parcel is located within an Economic Development District, Commercial Transition <br />Activity Node, Commercial - Industrial Transition Activity Node, or Rural Neighborhood <br />Activity Node, or Rural Community Activity Node, as designated by the Comprehensive <br />Plan; or 78 <br />78 The existing requirement of not permitting more than one principal use on a lot unless a Conditional Use or <br />Conditional Zoning District is approved is one of the major impediments to promoting economic development in <br />Orange County. Prior to the adoption of the UDO in April 2011 which added the MPD -CZ district and removed the <br />requirement for a Class A Special Use Permit (SUP) for MPD -CZ projects only, any large project was required to <br />obtain a Class A SUP. From a project proponent's perspective, the process components and uncertainty this injected <br />into the approval process is onerous. Staff is suggesting that in the designated non - residential growth areas of the <br />County (the land use categories listed), more than one principal use be permitted without requiring a CUD or CZD <br />just because more than one principal use is proposed. (Note that there may be other instances where projects would <br />still require a CUD or CZD, it just would not be for the reason of having more than one principal use). All other <br />applicable standards in the UDO would still apply. It should also be noted that, at the present tune, most lands <br />within these designated non - residential growth areas would require a rezoning application. Additionally, all non- <br />residential projects are required to submit a site plan for staff review and approval in order to receive a Zoning <br />Compliance permit (see Section 2.4). It should also be noted that if "Industrial Activity Node" is not deleted as a <br />land use category from the Comprehensive Plan (see related amendment), the tern needs to be added here. <br />Orange County, North Carolina — Unified Development Ordinance Page 6 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.