Orange County NC Website
306 <br />Article 3: Base Zoning Districts <br />Section 3.5: Industrial Districts <br />Lot Size, min., per use I 20,000 <br />(square feet) <br />The purpose of the Heavy Industrial -3 (1 -3) District is to provide <br />locations for enterprises engaged in a broad range of ,,, IMP <br />manufacturing, processing, creating, repairing, renovating, Front Setback from NR 50 <br />painting, cleaning, or assembling of goods, merchandise or ROW, min. (feet) <br />equipment. Performance standards will be used to insure the NR-CU None <br />absences of adverse impacts beyond the zoning district. <br />This district will usually be applied where the following conditions <br />exist: Rear Setback, min. <br />(feet) None [2] <br />1. Site is located within areas designated by the adopted <br />Comprehensive Plan as an IndustFial TFansilien Antivity Nede a <br />Commercial - Industrial Transition Activity Node.27 <br />2. Water and sewer mains exist at the site or be made available <br />as part of the development process. <br />Floor Area Ratio, max. NR .400 <br />DIMENSIONAL STANDARDS NOTES: NR-CU 450 Regifed Opel Space NR, 6` <br />[1] R = residential, NR = non - residential, CU = conditional use <br />, ... ; <br />[2] Required side and rear setbacks adjacent to residentially <br />Ratio ,amlrr + NR,. CU 650; <br />zoned land shall be equal to the required side or rear setback of Gross Land Area, 623,144/ <br />the adjacent residential district. min. /max. NR-CU <br />none <br />[3] Two feet of additional height shall be allowed for one foot (s q uare feet) <br />increase of the required front and side setbacks. <br />Uses shall be restricted to those indicated for the 1 -3 District in Section 5.2, unless a Conditional Use (CU) or <br />MPD -CZ District is approved (see Section 3.8). Additionally, non - residential uses are restricted based on <br />the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.3 for land <br />use restrictions. <br />Development within the zoning district shall be subject to all applicable use standards detailed in Article 5 <br />and all applicable development standards detailed in Article 6 of this Ordinance. See Sections 6.2.5 and <br />6.2.6 if more than one principal use or principal structure is proposed on a non - residential zoning lot.28 <br />27 The Commercial - Industrial Land Use category is a discrete category on the Land Use and Zoning Matrix <br />contained in Appendix F of the County's Comprehensive Plan but it is not described as a separate category and is <br />not consistently referred to in the UDO. Staff believes this is an oversight that may have occurred in the late 1980's <br />or 1990's when the Comprehensive Plan was changed to include a combined Commercial- Industrial Activity Node <br />category on the Land Use Element Map and on the matrix, but other necessary updates were not made. Staff <br />considers this to be a "clean -up" or "housekeeping" amendment to reflect intent and interpretation which will <br />provide clarity and conciseness to the regulations. Note that a Comprehensive Plan amendment is also proposed as a <br />separate item to fix these inconsistencies. , <br />28 Changes to Sections 6.2.5 and 6.2.6 are proposed (see relevant portion of this amendment package). Since the <br />proposed changes involve an additional exception, staff is suggesting that language be added to #2 to direct users to <br />Orange County, North Carolina — Unified Development Ordinance <br />Page 3 -38 <br />