Orange County NC Website
Article 2: Procedures 287 <br />Section 2.16: Subdivisions in the Economic Development, Commercial, and /or COMMERCIAL - INDUSTRIAL <br />Industrial NodesOFOF <br />2.15.5 Certificate of Adequacy of Public School Facilities <br />No approval of a major subdivision preliminary plat or a minor subdivision final plat for a <br />residential development shall become effective unless and until a Certificate of Adequacy of <br />Public School Facilities (CAPS) for the project has been issued by the relevant School District. <br />See Section 6.19 for standards related to CAPS. <br />(A) All subdivisions in the Economic Development, Commercial, and /or Commercial - <br />Industrial and/oF Indust Nodes, as identified in the Comprehensive Plan, shall submit <br />an application in accordance with the requirements specified in Section 2.15.3(8). <br />(B) Initial review of all subdivisions in the Economic Development, Commercial, and /or <br />Commercial - Industrial Nodes shall be performed by the Planning <br />Department. <br />(C) Following review by the Planning Department all subdivisions shall follow the major <br />subdivision preliminary plat approval procedures specified in Section 2.15.3. <br />(D) All roads in the Nodes identified in (A) above are required to be public and constructed to <br />North Carolina Department of Transportation standards. <br />(E) Final plat approvals shall follow the final plat approval procedures in Section 2.15.4. <br />(F) Additional Requirements for Hillsborough Economic Development District: <br />(1) When a MPD -CZ rezoning petition is approved, and the tract that is subject of <br />said rezoning is proposed to be subdivided, all provisions of Article 7 shall be <br />satisfied. <br />(a) The applicant may obtain approval of the subdivision simultaneously with <br />the approval of the rezoning if sufficient information (i.e. lot lines, lot size, <br />etc) is shown on the site plan or at a later time. <br />(b) The subdivision shall be consistent with the terms of the MPD -CZ and <br />Special Use Permit, Class A (as applicable) that is approved along with <br />the rezoning petition. <br />(c) If the Master Plan and Special Use Permit, Class A (as applicable) that is <br />approved along with the MPD -CZ rezoning petition establishes density, <br />floor area, impervious surface, or similar limitations on the tract that is <br />rezoned or any portion thereof, the subdivision final plat that creates lots <br />out of any portion of the tract so encumbered shall indicate on the face of <br />the plat with respect to each lot such limitations or restrictions as are <br />necessary to ensure compliance with the Master Plan and MPD -CZ <br />rezoning approval. <br />9 The Commercial - Industrial Land Use category is a discrete category on the Land Use and Zoning Matrix contained <br />in Appendix F of the County's Comprehensive Plan but it is not described as a separate category and is not <br />consistently referred to in the UDO. Staff believes this is an oversight that may have occurred in the late 1980's or <br />1990's when the Comprehensive Plan was changed to include a combined Commercial- Industrial Activity Node <br />category on the Land Use Element Map and on the matrix, but other necessary updates were not made. Staff <br />considers this to be a "clean -up" or "housekeeping" amendment to reflect intent and interpretation which will <br />provide clarity and conciseness to the regulations. Note that a Comprehensive Plan amendment is also proposed as a <br />separate item to fix these inconsistencies. <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -57 <br />