Orange County NC Website
Article 2: Procedures <br />286 <br />Section 2.6: Floodplain Development Permit and Certificate Requirements <br />- - r_ - _ W, z ! '! -- <br />• <br />2.6.1 Requirements for Special Flood Hazard Area Overlay District <br />All projects proposing the development of property located within the Special Flood Hazard Area <br />Overlay District shall be required, regardless of the proposed land use, to submit a site plan <br />prepared by a registered engineer, landscape architect, or land surveyor in accordance with the <br />provisions of Section 2.5. <br />2.6.2 Plans and Application Requirements <br />Application for a floodplain development permit shall be made to the Floodplain Administrator on <br />forms furnished by the Planning Department prior to any development activities proposed to be <br />located within flood prone areas. <br />The following items/ information shall be presented to the Floodplain Administrator to apply for a <br />floodplain development permit: <br />(A) A plot plan drawn to scale which shall include, but shall not be limited to, the following <br />specific details of the proposed floodplain development: <br />(1) The nature, location, dimensions, and elevations of the area of <br />development/disturbance; existing and proposed structures, driveways, utility <br />systems, grading /pavement areas, fill materials, storage areas, drainage <br />facilities, and other development; <br />(2) The boundary of the SFHA as delineated on the FIRM or other flood map as <br />determined in Section 4.3.5 or a statement that the entire lot is within the SFHA; <br />(3) Flood zone(s) designation of the proposed development area as determined on <br />the FIRM or other flood map as determined in Section 4.3.5; <br />(4) The boundary of the floodway(s) or non- encroachment area(s) as determined in <br />Section 4.3.5; <br />(5) The Base Flood Elevation (BFE) where provided as set forth in Sections 4.3.5, <br />1. 10.2 (K) and (L), and 6.6.1; <br />(6) The old and new location of any watercourse that will be altered or relocated as a <br />result of proposed development; and <br />(7) Preparation of the plot plan by or under the direct supervision of a North Carolina <br />licensed professional Land Surveyor or Professional Engineer and certified by <br />them. <br />(B) Proposed elevation, and method thereof, of all development within a SFHA including but <br />not limited to: <br />(1) Elevation in relation to mean sea level of the proposed reference level (including <br />basement) of all structures; <br />(2) Elevation in relation to mean sea level to which any non - residential structure in <br />Zone AE will be flood - proofed; and <br />(3) Elevation in relation to mean sea level to which any proposed utility systems will <br />be elevated or flood proofed. <br />8 This is not an additional requirement for projects in EDDs; it is applicable to all projects . This is an unnecessary <br />renmant of the process components contained in the EDD Design Manual that was carried over when the Manual <br />was incorporated into the UDO. <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -15 <br />