Orange County NC Website
284 <br />Article 2: Procedures <br />Section 25' Site Plan Raviaw <br />(B) Major Transportation Corridor Overlay District <br />(1) Approval Requirements <br />Within the Major Transportation Corridor District, no construction activity shall <br />begin nor shall any excavation, soil removal, filling, grading or disturbance of <br />vegetation, including trees, be commenced, nor any sign erected until such time <br />as a site plan has been approved and a permit issued by the Planning Director in <br />accordance with this Section and Sections 2.4 aR -2.5 -4 of this Ordinance. <br />2 Other than one requirement, this section is redundant with Section 2.5.3. The one requirement is suggested to be <br />added to Section 2.5.3 and this subsection can then be deleted. [see related footnote in Section 2.5.31. <br />Orange County, North Carolina - Unified Development Ordinance <br />Page 2 -13 <br />#efleWi-ag; <br />(-G) The di-mensip-Rq. a3Rd arreag8 of each In# n h <br />th f + h <br />I <br />l.11]GD -t�L +h� ica ed <br />hi-lilt <br />(e) The <br />The leGa }in of n i tS of tFy d '+ f <br />1L / <br />ve -_ulcr...,c4'I <br />I <br />Pals f'0.18� <br />Grading. drainage. sedimentatipn and n rrre <br />Gf fe-;Y <br />. erqs, <br />(k) The lacatin-A of existiRg and <br />I_ac Ntities. <br />_f_e i{i , <br />buffer. •-nrl rtr-+ a e s m + <br />rrr�` The tkN -ef -walls fin a rail +n "�� <br />S. skeam <br />a in2 +inr< <br />sand <br />their height and G Stn nt'nn materials. <br />an in „f <br />#� �,,� <br />iR(3ttidi'R'g <br />.. <br />Ater sem� <br />. erJ-- <br />2 Other than one requirement, this section is redundant with Section 2.5.3. The one requirement is suggested to be <br />added to Section 2.5.3 and this subsection can then be deleted. [see related footnote in Section 2.5.31. <br />Orange County, North Carolina - Unified Development Ordinance <br />Page 2 -13 <br />