Browse
Search
Agenda - 11-21-2011 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-21-2011 - Quarterly Public Hearing - Late
>
Agenda - 11-21-2011 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2015 4:29:58 PM
Creation date
2/9/2012 4:33:48 PM
Metadata
Fields
Template:
BOCC
Date
11/21/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 11-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 <br />uro:,ira Mends School <br />Traffic Impact Analysis <br />C. Projected Roadway Improvements <br />There are no known transportation projects planned in the immediate vicinity of <br />this development that will be constructed prior to the Build Out year. <br />D. Public Transportation <br />There is no public transportation that covers this part of Orange County. <br />The amount of traffic generated by a new development is a function of the size <br />and type of development. Once the proposed land use data for the site are <br />known, the number of trips generated by the development can be estimated. <br />Trip generation data for this report was determined by utilizing the School Traffic <br />Calculator developed by the NCDOT Municipal and School Traffic Assistance <br />Unite. Trip generation estimates were developed in terms of vehicle trips per <br />average morning and afternoon peak hours for the school. <br />Table 1: AASTA Trip Generation2 <br />j Vahicles <br />AM Veak <br />phi beak <br />Cenci Use <br />Density <br />In <br />Out <br />to <br />Out <br />Existiricg Scho")ol <br />433 students / G-5 Aare /5.5 <br />32,€ <br />11 a a <br />I G <br />.171 <br />student drivers <br />I <br />f <br />Future School <br />®ft students / 90 staff / 60 <br />337 <br />217 <br />133 <br />193 <br />student drivers <br />Additional Total Trips <br />;-17 <br />•i 22 <br />According to the trip estimates provided by NCDOT, the proposed addition will <br />not add a significant amount of traffic to the surrounding roadway network. <br />Approximately 68 additional vehicles will utilize the school access in the morning <br />and 39 additional vehicles will utilize the school access in the afternoon. <br />March 2011 Page 5 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.