Orange County NC Website
27 <br />B. STATE PERMITS REQUIRED <br />1. Does the project involve the mining of earth products? <br />No <br />If so, how many��ic feet of material are expected to be <br />excavated? <br />Has an applicat' n for a Mining Permit been submitted to <br />NCDRCD? <br />Please attach map indicating expected extent of proposed <br />activity. <br />2. Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Enviroimental 'Protection Agency? (A listing of all <br />hazardous mater als is available from the Planning <br />Department) o - - -- <br />Describe the wastes to be generated. —NIA <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? <br />Volume? <br />