Browse
Search
RES-2012-018 Resolution Amending the 2030 Comprehensive Plan
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2012
>
RES-2012-018 Resolution Amending the 2030 Comprehensive Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 9:09:45 AM
Creation date
2/9/2012 3:48:46 PM
Metadata
Fields
Template:
BOCC
Date
2/7/2012
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
7d
Document Relationships
Agenda - 02-07-2012 - 7d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 02-07-2012 - Regular Mtg.
Minutes 02-07-2012
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 4 <br /> Chapter 5: Land Use Element <br /> according to the New Hope Corridor Open Space Master Plan <br /> completed in April of 1991. This classification is part of a system of <br /> open space in Durham and Orange Counties along New Hope Creek <br /> and its tributaries between Eno River State Park and U.S. Army Corps <br /> of Engineers land north of Jordan Lake. The New Hope Corridor Open <br /> Space is made up of critical environmental areas such as stream beds, <br /> floodplains, steep slopes, and larger tracts of historic, educational, or <br /> recreational value. <br /> Stoney Creek Basin- <br /> Land within the boundaries of the 4,696 acre Stoney Creek Drainage <br /> Basin southeast of the Town of Hillsborough in portions of <br /> Hillsborough, Eno, and Chapel Hill Townships. The area is triangular <br /> in shape and is bound generally by 1-85 to the north, the University <br /> Spur of Southern Railroad to the east, and NC Highway 86 to the west. <br /> For each land use classification and overlay, sets of criteria have been developed <br /> that describe the physical and environmental context, the projected population <br /> change, and resulting land requirements. (See Appendix G: Land Use Platt <br /> Eery-Classification and Overlay Locational Criteria.) <br /> Map 5-4: Future Land Use Map, designates the areas where these classifications <br /> are applied. <br /> Ora iW,Cm"tty CoTnprehe+vsive Pla w Page 5-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.