Browse
Search
2012-012 AMS - 5th Wall, LLC Roof Replacement Design Ser for Court Strreet Annex $7,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-012 AMS - 5th Wall, LLC Roof Replacement Design Ser for Court Strreet Annex $7,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:24:22 AM
Creation date
2/9/2012 3:02:50 PM
Metadata
Fields
Template:
BOCC
Date
2/9/2012
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
2012-012 S AMS - 5th Wall LLC for roof replacement design services at Court Street Annex $7,400
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne Fenton <br />Roof replacement design services <br />Court Street Annex <br />Hillsborough, NC <br />SthWall Proposal No. 12-01-02 <br />January 10, 2012 <br />Page 2 <br />B. Bidding <br />1. Attending Pre-Bid Conference <br />2. Preparing and distributing Minutes of the Pre-Bid Conference <br />3. Preparing any required addenda to the plans and specifications <br />4. Addressing Contractor and Owner questions during the bid period <br />5. Assisting in review of bids and making appropriate recommendations <br />C. Contract Administration <br />1. Preparing the contract between Owner and Contractor <br />2. Reviewing Contractor submittals <br />3. Attending Pre-Construction Conference <br />4. Preparing and distributing Minutes of the Pre-Construction Conference <br />5. Attending periodic progress meetings <br />6. Addressing Contractor and Owner questions during construction <br />7. Review Contractor Pay Requests <br />D. Construction Quality Assurance <br />Performing periodic site visits during construction to assure that work is being performed <br />in accordance with the plans and specifications. <br />During our site visits we will meet with your personnel, attend scheduled meetings, check <br />materials, observe construction in progress, examine completed work, and discuss future <br />work. A report summarizing our observations will be provided to Colliers International <br />Management. <br />Based on our understanding of the current scope of work, we anticipate the duration of <br />construction to be approximately 45 consecutive calendar days depending on the type of <br />roof system. As such, we recommend that site visits be performed at an average <br />frequency of one visit per week throughout the course of construction activity. The <br />frequency of visits may vary depending on the nature of work taking place. Additionally, <br />an increased number of visits are recommended at the beginning of the project in order to <br />assure a full understanding of requirements and needs. Therefore, we anticipate that <br />approximately 6 visits will be required to assure conformance of construction activities <br />with the project documents and verify that all items have been properly addressed. <br />2. Conducting a Prefmal (Punchlist) inspection <br />Non-compliant items will be documented in a written punchlist with copies provided to <br />Colliers International Management and the Contractor. <br />3. Conducting a Final inspection <br />9601 Baileywick Rd • Raleigh, NC 27615 www.5thwallbdc.com <br />919/616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.