Browse
Search
Agenda - 02-07-2012 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-07-2012 - Regular Mtg.
>
Agenda - 02-07-2012 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 10:49:06 AM
Creation date
2/3/2012 2:45:15 PM
Metadata
Fields
Template:
BOCC
Date
2/7/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
Minutes 02-07-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-004 Amendments to Unified Development Ordinance Text (UDO /Zoning 2011 -06
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 � <br /> Article 3: Base Zoning Districts <br /> Section 3.5: Industrial Districts <br /> 1-3 DIMENSION I AL AND RATIO STA I NDARAZ <br /> HEAVY INDUSTRIAL <br /> Lot Size, min., per use <br /> 20,000 <br /> s ware feet <br /> ( q ) <br /> PURPOSE NR 100 <br /> The purpose of the Heavy Industrial-3(I-3) District is to provide Lot Width, mina(feet) NR-CU None <br /> locations for enterprises engaged in a broad range of _ <br /> manufacturing, processing,creating, repairing, renovating, Front Setback from NR 50 <br /> painting,cleaning, or assembling of goods, merchandise or ROW, min. (feet) <br /> equipment. Performance standards will be used to insure the NR-CU None <br /> absences of adverse impacts beyond the zoning district <br /> bounds . Side Setback, min. None[2 <br /> (feet) <br /> APPLICABILITY <br /> This district will usually be applied where the following conditions <br /> exist: Rear Setback, min. None[2] <br /> (feet) <br /> 1. Site is located within areas designated by the adopted <br /> Comprehensive Plan as w a <br /> Commercial-Industrial Transition Activity Node.27 <br /> 2. Water and sewer mains exist at the site or be made available Height, max. (feet) 45[3] <br /> as part of the development process. <br /> Floor Area Ratio, max. NR .400 <br /> NR-CU .450 <br /> DIMENSIONAL STANDARDS NOTES: Required Open Space NR .675 <br /> [1]R=residential, NR=non-residential, CU=conditional use. Ratio, min. NR-CU .650 <br /> [2] Required side and rear setbacks adjacent to residentially <br /> zoned land shall be equal to the required side or rear setback of Gross Land Area, 623,144/ <br /> the adjacent residential district. min./max. NR-CU none <br /> [3]Two feet of additional height shall be allowed for one foot (square feet) <br /> increase of the required front and side setbacks. Required NR .169 <br /> Pedestrian/Landscape <br /> Ratio, min. NR-CU .163 <br /> DISTRICT SPECIFIC DEVELOPMENT STANDARDS <br /> 1. Uses shall be restricted to those indicated for the 1-3 District in Section 5.2, unless a Conditional Use(CU)or <br /> MPD-CZ District is approved(see Section 3.8). Additionally, non-residential uses are restricted based)on <br /> the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.3 for land <br /> use restrictions. <br /> 2. Development within the zoning district shall be subject to all applicable use standards detailed in Article 5 <br /> and all applicable development standards detailed in Article 6 of this Ordinance. See Sections 6.2.5 and <br /> 6.2.6 if more than one principal use or principal structure is proposed on a non-residential zoning lot.28 <br /> 27 The Commercial-Industrial Land Use category is a discrete category on the Land Use and Zoning Matrix <br /> contained in Appendix F of the County's Comprehensive Plan but it is not described as a separate category and is <br /> not consistently referred to in the UDO. Staff believes this is an oversight that may have occurred in the late 1980's <br /> or 1990's when the Comprehensive Plan was changed to include a combined Commercial-Industrial Activity Node <br /> category on the Land Use Element Map and on the matrix,but other necessary updates were not made. Staff <br /> considers this to be a"clean-up"or"housekeeping"amendment to reflect intent and interpretation which will <br /> provide clarity and conciseness to the regulations. Note that a Comprehensive Plan amendment is also proposed as a <br /> separate item to fix these inconsistencies. <br /> 28 Changes to Sections 6.2.5 and 6.2.6 are proposed(see relevant portion of this amendment package). Since the <br /> proposed changes involve an additional exception,staff is suggesting that language be added to#2 to direct users to <br /> Orange County,North Carolina—Unified Development Ordinance Page 3-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.