Browse
Search
Agenda - 02-07-2012 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-07-2012 - Regular Mtg.
>
Agenda - 02-07-2012 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 10:49:06 AM
Creation date
2/3/2012 2:45:15 PM
Metadata
Fields
Template:
BOCC
Date
2/7/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
Minutes 02-07-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-004 Amendments to Unified Development Ordinance Text (UDO /Zoning 2011 -06
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br /> Article 3: Base Zoning Districts <br /> Section 3.5: Industrial Districts <br /> • INDUSTRIAL <br /> DIMENSIONAL . RATIO STANDARDS <br /> LIGHT INDUSTRIAL Lot Size, min., per use <br /> (square feet) 80,000[1] <br /> PURPOSE NR[2] 200 <br /> Lot Width, min. (feet) <br /> The purpose of the Light Industrial-1 (1-1) District is to provide NR-CU None <br /> appropriately located and sized sites for limited industrial uses <br /> engaged in manufacturing, processing, creating and assembling Front Setback from NR 50 <br /> of goods, merchandise or equipment. Performance standards ROW, min. (feet) NR-CU None <br /> will be used to insure the absence of adverse impacts beyond <br /> the immediate space occupied by the building. Side Setback, min. NR 50 <br /> APPLICABILITY (feet) NR-CU None[3] <br /> This district will usually be applied where the following conditions NR 50 <br /> exist: Rear Setback, min. <br /> (feet) <br /> 1. Site is located within areas designated in the adopted NR-CU None[3] <br /> Comprehensive Plan as either aa-IRustial ty <br /> Node-a Commercial-Industrial Transition Activity Node or a Height, max. (feet) 45[4] <br /> Rural Industrial Activity Node.23 <br /> DIMENSIONAL STANDARDS NOTES: Floor Area Ratio, max. .200 <br /> [1]Lot size for individual uses shall be appropriate to the method Required Open Space NR .80 <br /> of water supply and sewage disposal. Ratio, min. NR-CU .75 <br /> [2]R=residential, NR=non-residential, CU=conditional use. <br /> 3 Required side and rear setbacks adjacent to residential) Gross Land Area, <br /> [ ] q y min./max. NR-CLI 80,000/ <br /> / <br /> zoned land shall be equal to the required side or rear setback of none <br /> the adjacent residential district. (square feet) <br /> [4]Two feet of additional height shall be allowed for one foot Required NR .20 <br /> increase of the required front and side setbacks. Pedestrian/Landscape <br /> Ratio, min. NR-CU .187 <br /> DISTRICT SPECIFIC DEVELOPMENT STANDARDS <br /> 1. Uses shall be restricted to those indicated for the 1-1 District in Section 5.2, unless a Conditional Use(CU)or <br /> MPD-CZ District is approved(see Section 3.8). Additionally, non-residential uses are restricted based on <br /> the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.3 for land <br /> use restrictions. <br /> 2. Development within the zoning district shall be subject to all applicable use standards detailed in Article 5 <br /> and all applicable development standards detailed in Article 6 of this Ordinance. See Sections 6.2.5 and <br /> 6.2.6 if more than one principal use or principal structure is proposed on a non-residential zoning Iot.24 <br /> 23 The Commercial-Industrial Land Use category is a discrete category on the Land Use and Zoning Matrix <br /> contained in Appendix F of the County's Comprehensive Plan but it is not described as a separate category and is <br /> not consistently referred to in the UDO. Staff believes this is an oversight that may have occurred in the late 1.980's <br /> or 1990's when the Comprehensive Plan was changed to include a combined Commercial-Industrial Activity:node <br /> category on the Land Use Element Map and on the matrix,but other necessary updates were not made. Staff <br /> considers this to be a"clean-up"or"housekeeping"amendment to reflect intent and interpretation which will <br /> provide clarity and conciseness to the regulations. Note that a Comprehensive Plan amendment is also proposed as a <br /> separate item to fix these inconsistencies. <br /> 24 Changes to Sections 6.2.5 and 6.2.6 are proposed(see relevant portion of this amendment package). Since the <br /> proposed changes involve an additional exception,staff is suggesting that language be added to 92 to direct users to <br /> Orange County,North Carolina—Unified Development Ordinance Page 3-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.