Browse
Search
Agenda - 01-24-2012 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 01-24-2012 - Regular Mtg.
>
Agenda - 01-24-2012 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2015 3:08:42 PM
Creation date
1/20/2012 2:45:31 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes 01-24-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: January 24, 2012 <br />Action Agenda <br />Item No. ~ - GZ. <br />SUBJECT• Update on Buckhorn-Mebane Phase 2 Water and Sewer Utility Design <br />DEPARTMENT: Planning PUBLIC HEARING: (Y/N) [N~ <br />ATTACHMENT(S): <br />1. Project Timeline Projection <br />2. Map Showing Water Project Area <br />3. Map Showing Sewer Project Area <br />INFORMATION CONTACT: <br />Kevin Lindley, PE, Staff Engineer, 245- <br />2583 <br />Craig Benedict, Planning Director, 245- <br />2592 <br />PURPOSE: To receive an update on the progress of the Buckhorn-Mebane Phase 2 utility <br />design for economic development. <br />BACKGROUND: At this point in the process, the preliminary design of the infrastructure is <br />complete and the plans are currently being reviewed by both Orange County and City of <br />Mebane staff. The routing of the proposed water and sewer lines can be seen in Attachments <br />2 and 3, respectively. Once this review is complete, likely by the end of January, any comments <br />generated by the review will be forwarded to the County's engineering consultant, Hobbs, <br />Upchurch and Associates (HUA). HUA will incorporate the comments and create a final set of <br />plans for distribution to various State agencies for permitting and project approval. <br />From the time plans and permit applications are submitted to the State, HUA is anticipating a <br />minimum of 90 days until the permits have all been approved and issued. Amore realistic time <br />frame would likely be 4-5 months, which includes time for the County and HUA to receive and <br />respond to any comments from the State reviewers. This timeline is shown in Attachment 1. <br />Concurrent with permit applications for this project, planning and engineering staff are pursuing <br />a modified agreement with the City of Mebane to receive and treat the wastewater which will <br />ultimately be generated by the areas served with this infrastructure. Orange County currently <br />has an agreement with the City of Mebane, signed in 2004, which Mebane has agreed to <br />provide water and sewer utility service to a portion (approximately 800 acres) of the Buckhorn <br />Economic Development District (EDD) and land near the Petro Mart off of Buckhorn Road. <br />However, the gravity outfall section north of Bowman Road, which is part of this Phase 2 <br />infrastructure project, has the potential to serve an area not covered by the existing agreement. <br />A draft version of this modified agreement, which will include over 400 additional acres, is <br />
The URL can be used to link to this page
Your browser does not support the video tag.