Browse
Search
Agenda - 01-24-2012 - 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 01-24-2012 - Regular Mtg.
>
Agenda - 01-24-2012 - 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2015 3:00:41 PM
Creation date
1/20/2012 2:41:08 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes 01-24-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />NORTHERN HUMAN SERVICES CENTER COMMUNITY FACILITY <br />BACKGROUND <br />The Northern Human Services Center, originally a school facility, was <br />constructed in 1950, with a later addition in 1957 that included the kitchen and <br />dining area. The facility has seen few significant changes since original <br />construction and includes many of its original elements. Although the original <br />coal-fired boiler was later replaced with an oil-fired boiler, most of the original <br />radiator and steam line heating system is still in place, as are the original single- <br />glazed, metal frame windows, and exterior doors, all of which are very inefficient <br />from an energy standpoint. Interior plumbing lines were previously replaced, as <br />were waste water lines outside of the footprint of the building. Very few structural <br />changes have been made since original construction. <br />OPTIONS <br />Several options for maintaining a community facility at the Northern Center <br />location exist, including: <br />1. Total removal of existing facility and replacement with apre-engineered <br />structure of approximately 10,000 square feet, with masonry and/or block <br />accented exterior walls at an approximate cost of $1,932,000 <br />($193/square foot)., <br />2. Total removal of existing facility and replacement with a similarly designed <br />structure (masonry block with brick veneer) of approximately 10,000 <br />square feet, at an approximate cost of $2,618,000 ($262/square foot). <br />3. Removal of the classroom wings on the north and south ends of the <br />facilit ,including the large central restrooms in the south wing, with <br />adaptive reuse of the gymnasium, kitchen/dining areas, and the central <br />lobby and offices, at an approximate cost of $1,963,000 ($196/square <br />foot). Metal building components (window and door frames, roof trusses, <br />etc.) would be recovered for recycling, and masonry products would be <br />evaluated for processing and recycling on-site as aggregate substitute for <br />fill and parking lot construction.1 Figures 1 and 2 provide an overview of <br />the approximate areas to be removed, and areas that would remain.2 <br />The attached schematic budget comparisons include substantial contingencies <br />for each option, and are not based on any developmental design plans or <br />drawings. <br />For comparative purposes, previous CIP estimates for refurbishment of the entire <br />facility were approximately $3,278,000, not including parking improvements. <br />Any of the options identified here could accommodate a park and ride lot. <br />Crushing at the actual construction site using portable crushers reduces construction costs and the pollution generated <br />when compared with transporting material to and from a quarry. htto~Uen wikipedia oro/wiki/Concrete recvclino <br />s An initial assessment by a structural engineer confirmed that the °wings" can be removed without structurally <br />compromising the portion of the building to remain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.