Browse
Search
2011-385 AMS - McGill Associates, P.A. - design of McGowan Creek Gravity Sewer Interceptor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-385 AMS - McGill Associates, P.A. - design of McGowan Creek Gravity Sewer Interceptor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 3:56:45 PM
Creation date
1/17/2012 4:27:31 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cal <br />A 5 5 0 C I A T E S <br />October 20, 2011 <br />Mr. Craig Benedict, Director <br />Planning and Inspections <br />Orange County <br />200 South Cameron Street <br />Hillsborough, North Carolina 27278 <br />RE: Proposal for Additional Services <br />Central Efland/Northern Buckhom <br />Sewer Extension <br />Orange County, North Carolina <br />Dear Mr. Benedict: <br />Pursuant to discussions with County staff, we are pleased to provide this proposal for <br />additional engineering services for the Central Efland/Northern Buckhorn Sewer Extension <br />Project, outside of our original scope of work, We understand that Orange County desires to <br />route sewer flow from the existing McGowan Pump Station (PS) along a new gravity sewer <br />interceptor to the currently proposed Brookhollow PS. Consequently, sewer flows from this <br />drainage basin would ultimately be pumped via the Brookhollow PS for treatment. To facilitate <br />this change in the project scope, we further understand that the project will be modified in the <br />following ways: __. _ _ __ _ _ _ _ _ _ _ _ _ .. __ _ . <br />• Approximately 2,600 linear feet of 12-inch diameter gravity sewer would be <br />constructed parallel to McGowan Creek from the existing pump station to the <br />proposed pump station (McGowan Sewer Interceptor). <br />• The proposed pump station depth, volume, and pumping capacity will need to be <br />modified to accommodate the additional flows. <br />• The sewer force main proposed for the project will need to be increased in size, <br />and the routing modified to direct flows along the existing force main to <br />Hillsborough. <br />In addition to routing of sewer flow from the proposed Brookhollow PS to Hillsborough, <br />the County may desire to direct flows from the Efland area to Mebane in the future. <br />This request for additional services shall be governed by the conditions outlined in our <br />original Engineering Services Agreement dated August 26, 2011. Given these potential changes <br />in the project, we anticipate providing the following Scope of Additional Services: <br />Engineering Planning F i n a n c e <br />rLIcGi11 Associates, P.A. • P.O. Bor 1136, Hickory, NC 28603 • 12d0 19th St. Lane N6T; Hlcko~y, NC 28601 <br />Offrce: 828-328-202d • Fas: 828-328-3870 <br />
The URL can be used to link to this page
Your browser does not support the video tag.