Orange County NC Website
Mr. Craig Benedict <br />October 20, 2011 <br />Page 4 <br />^ Additional services resulting from significant changes in the general Scope of the <br />Project (beyond those described above) or its design including, but not limited to, <br />changes in size, complexity, OWNER's schedule, or character of construction. <br />^ Providing geotechnical and subsurface investigations, and any other environmental site <br />surveys necessary for the construction of the project. <br />o Preparing to serve or serving as a witness for the OWNER in any litigation, <br />condemnation, or other legal or administrative proceeding involving the Project. <br />^ Providing construction phase services for construction of the McGowan Sewer <br />Interceptor. <br />Thank you for the opportunity to provide this proposal for this important project. If you <br />fmd this proposal acceptable, please send an executed copy of this proposal to our office as your <br />authorization to proceed. <br />Sincerely, <br />M~GILL ASSOCIATES, P.A. <br />P.E. <br />Accepted by: <br />ORANGE COUNTY <br />Mr. Frank Clifton, County Manager <br />Date <br />