Orange County NC Website
Mr. Craig Benedict <br />October 20, 2011 <br />Page 3 <br />^ Prepare revised pump station construction drawings and specifications to meet needed depth, <br />volume, and pumping capacity for future ready conditions. <br />^ Submit revised pump station plans, specifications, and design calculations to Construction <br />Grants and Loans (CG&L) for review and approval. <br />^ Assist OWNER in coordinating any geotechnical testing for the proposed sewer interceptor <br />and/or Brookhollow PS. <br />BASIS OF COMPENSATION <br />We anticipate performing the scope of services for the following lump sum fees: <br />1. Survey <br />Engineering Fee: $6,500.00 <br />2. McGowan Sewer Interceptor Preliminary Design <br />Engineering Fee: $9,500.00 <br />3. Brookhollow PS Analysis and Redesign ~ <br />Engineering Fee: $23,000.00 <br />Total Fixed EnEineering-Fee: $39,000.00. _ _ _ _ _ _ _ _ _ _ __ _ . <br />Several work elements, beyond that outlined above, have been additionally identified to <br />potentially accompany this work. The following Lump Sum fees shall apply to those services: <br />1. Providing complete design, construction plans and specifications, and permitting for the <br />McGowan Sewer Interceptor. <br />Lump Sum Fee: $14,000.00 <br />2. Providing Easement Maps for Five (5) Parcels along the McGowan Sewer Interceptor: <br />Lump Sum Fee: $4,000.00 <br />Payment shall be made monthly as work progresses. The above fees do not include the <br />following additional services. Should these services be needed, we will furnish them in accordance <br />with our regular fee schedule, upon your authorization. <br />