Browse
Search
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:16:35 PM
Creation date
1/17/2012 4:12:10 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sae[23'-6 �-444!'[tr-0 19 1-1 <br /> ,i <br /> q xi <br /> zi <br /> FRI EZER COOLJ R COOLER <br /> m <br /> PRELIMINARY <br /> DRAWING <br /> NSF CONSTRUCTION <br /> EMBOSSED GALVANIZED FINISH <br /> 4- XPS INSULATION <br /> c eoclt w X lw " DOORS: 60" X 84" <br /> �. `m`wr 80, ar g * PANELS <br /> ON= P.O. : <br /> Isar - <br /> I APPROVE THIS DRAWING SOUTHE AST COOLER CORP. <br /> d� �ll��i/• ��tG��� �° ,-,[• FOR MANUFACTURE LITHIA SPRINGS,GA <br /> SIGNATURE: SCN_E: DRAWN BY:hU <br /> DATE: DATE:OL 212011 APP.BY: <br />
The URL can be used to link to this page
Your browser does not support the video tag.