Browse
Search
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:16:35 PM
Creation date
1/17/2012 4:12:10 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST OF CHANGE WORKSHEET COC#015 <br /> Morlando Construction,LLC MC Project#:1003 <br /> Prepared By:Dominic Morlando Date:7/5/2011 <br /> Project:Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description Q Unit Labor Materials Sub Labor Material Subcontract Equipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> B&D Drywall see attached 1 $1,175.63 $0.00 $0.00 $1,175.63 $1.175.63 <br /> $0.00 $0.00 $0.00 $0.00 <br /> MC Feld Coordination see attached 30 32.5 $975.00 $975.00 $0.00 $0.00 $975.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Skyrock Construction(see attached) 1 $5,330.00 $0.00 $0.00 $5,330.00 $5,330.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Mackem Construction see attache 1 $7,473.00 $0.00 $0.00 $7,473.00 $7,473.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> PO Equipment Increase 1 $2,275.00 $0.00 $2,275.00 $0.00 $2,275.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE Contractors Subtotal $975.00 $2,275.00 $13,978.63 $0.00 $17,2$0.63 <br /> All Labor,Materials and Equipment to Install floor vents,stone, Sales Tax $176.31 $176.31 <br /> insulation,concrete slab,concrete ramp at the Freezer only and 4'X Payroll&WC Insurance 37% $360.75 $360.75 <br /> 18'concrete condensing unit pad. Includes Quartz Aggregate Epoxy Contractors Total Cost $17,765.69 <br /> floor and base finish in Freezer and Coolers. Overhead&Profit $1,776.57 <br /> Payment and Performance Bond $322.45 <br /> GL Insurance $69.53 <br /> Subtotal $19,934.24 <br /> Total Change Proposal Cost $19,934.24 <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> will,INCREASE 90 days, <br /> DECREASE days, REJECTED DATE <br /> NOT CHANGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.