Orange County NC Website
COST OF CHANGE WORKSHEET COC#015 <br /> Morlando Construction,LLC MC Project#:1003 <br /> Prepared By:Dominic Morlando Date:7/5/2011 <br /> Project:Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description Q Unit Labor Materials Sub Labor Material Subcontract Equipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> B&D Drywall see attached 1 $1,175.63 $0.00 $0.00 $1,175.63 $1.175.63 <br /> $0.00 $0.00 $0.00 $0.00 <br /> MC Feld Coordination see attached 30 32.5 $975.00 $975.00 $0.00 $0.00 $975.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Skyrock Construction(see attached) 1 $5,330.00 $0.00 $0.00 $5,330.00 $5,330.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Mackem Construction see attache 1 $7,473.00 $0.00 $0.00 $7,473.00 $7,473.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> PO Equipment Increase 1 $2,275.00 $0.00 $2,275.00 $0.00 $2,275.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE Contractors Subtotal $975.00 $2,275.00 $13,978.63 $0.00 $17,2$0.63 <br /> All Labor,Materials and Equipment to Install floor vents,stone, Sales Tax $176.31 $176.31 <br /> insulation,concrete slab,concrete ramp at the Freezer only and 4'X Payroll&WC Insurance 37% $360.75 $360.75 <br /> 18'concrete condensing unit pad. Includes Quartz Aggregate Epoxy Contractors Total Cost $17,765.69 <br /> floor and base finish in Freezer and Coolers. Overhead&Profit $1,776.57 <br /> Payment and Performance Bond $322.45 <br /> GL Insurance $69.53 <br /> Subtotal $19,934.24 <br /> Total Change Proposal Cost $19,934.24 <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> will,INCREASE 90 days, <br /> DECREASE days, REJECTED DATE <br /> NOT CHANGE <br />