Orange County NC Website
EWE <br /> Bill Muncy Electric <br /> PO Box 532 <br /> Mooresville, NC 28031 <br /> Office (704) 895-6200 <br /> Fax (704) 895-6283 <br /> Lic. 17688 <br /> Date: 8/18/2011 <br /> To: Morlando Construction <br /> Re: BME Proposal for Piedmont Food Project <br /> Dominic, per field memo #004 and the revisions that you sent to me, I quote a lump <br /> sum price of$3871.01 for the electrical portion as outlined below. The breakout is; <br /> Labor-38 hours at $48/hour (2 men, 2 days)=$1824.00 <br /> Material-$1573.18. I have attached our suppliers quote <br /> Tax-$121.92 <br /> Profit-$351.91. <br /> Total-$3871.01 <br /> If you have any questions please call. <br /> Thank You, <br /> Tom Murph <br /> 704-657-0066 cell <br />