Orange County NC Website
COST OF CHANGE WORKSHEET COC# 017R <br /> Morlando Construction,LLC MC Project#: 1003 <br /> Prepared By: Dominic Morlando Date:8/1812011 <br /> Project:Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description Q Unit Labor Materials Sub Labor Material Subcontract Equipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> Bill Muncy Electrical(see attached) 1 $3,871.01 $0.00 $0.00 $3,871.01 $3,871.01 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 1 0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE: Contractors Subtotal $0.00 $0.00 $3,871.01 $0.00 $3,871.01 <br /> All Labor,Materials and Equipment to Install the electrical Sales Tax r3 °' $0.00 $0.00 <br /> connections and circuits per attached quote for field memo#004 and Payroll&WC Insurance 37% $0.00 ' a, $0.00 <br /> revisions. Contractors Total Cost $3,871.01 <br /> Overhead&Profit J I $387.10 <br /> Payment and Performance Bond $70.26 <br /> GL Insurance � � ®� �i �� � � $15.15 <br /> Subtotal F ��� $4,343.52 <br /> Total Change Proposal Cost $4,343.52 <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> will,INCREASE days, <br /> DECREASE days, REJECTED DATE <br /> NOT CHANGE <br />