Browse
Search
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:16:35 PM
Creation date
1/17/2012 4:12:10 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B&D Drywall & Acoustical, Inc. WBE <br /> 3800 Oak Grove Ave. <br /> Greensboro NC, 27405 <br /> Ph: 336-273-7595 <br /> Fax: 336-273-7595 <br /> Mobil: 336-240-6881 <br /> Date: 5/4/2011 <br /> To: Morlando Construction, LLC <br /> Att: Dominic <br /> Project: Piedmont Food Building <br /> Change Order <br /> 1. Add 6"x 2" - 16 ga track drill 1/4" holes 6" on center both sides of <br /> track and fastened to the freezer floor 20' in length by 4' on center <br /> Material $480.63 <br /> Labor $695.00 <br /> Total $1,175.63 <br /> Thank You <br /> Betty Presnell I� <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.