Orange County NC Website
COST OF CHANGE WORKSHEET COC#002 <br /> Morlando Construction,LLC MC Project#: 1003 <br /> Prepared By: Dominic Morlando Date: 12/21/2010 <br /> Project:Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description Qty Unit Labor Materials Sub Labor Material Subcontract Equi ment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> Fast Sin 1 $325.84 $0.00 $0.00 $325.84 $325.84 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Morlando Construction Install 5 $38.50 $192.50 $0. $192.50 <br /> 00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Allowance#1 -$900.00.(Used$804.30) 1 -$96.70 $0.00 $0.00 ($96.70) ($96.70) <br /> $0.00 $0.00 1 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 1 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE: Contractors Subtotal $192.50 $0.00 $229.14 $0.00 $421.64 <br /> Sales Tax $0.00 .J $0.00 <br /> Add a 4'x 4'Site Sign per Request. $71.23 $71.23 <br /> Payroll&WC Insurance 37% $492 87 <br /> Contractors Total Cost <br /> Overhead&Profit $49.29 <br /> Payment and Performance Bond $8'95 <br /> GL Insurance $1.93 <br /> Subtotal $553.03 <br /> Total Change Proposal Cost = . ADD $553 <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> will,INCREASE days, DATE <br /> DECREASE days, REJECTED <br /> NOT CHANGE XXX <br />