Browse
Search
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:19:24 PM
Creation date
1/17/2012 4:04:08 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COC#020 <br /> COST OF CHANGE WORKSHEET MC Project#•1003 <br /> Morlando Construction,LLC• Date:10/3/2011 <br /> Prepared By,Dominic Morlando <br /> Project:Piedmont Food <br /> Architect Corley Redfoot Zack Unit Cost <br /> Descri !on City Unit Labor Materials Sub Labor Material Subcontract E uipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Bill Mun Electric see attached 1 $2,047.68 $0.00 $0.00 $2,047.68 $2 047.68 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> 00 <br /> $0.00 $0.00 $0.00 $0. <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> SCOPE Contractors Subtotal $0.00 $0.00 $2,047.68 $0.00 $2,0$70.68 <br /> $ 0.00 <br /> Al Labor,Materials and Equipment to add Eight(8)new light fixtures Sales Tax $0.00 •$0.00 <br /> and relocate Nine(9)of the existing right fixtures as directed by Payroll&WC Insurance 37'/0 $2,047.68 <br /> CRTs Light Level Review memo dated 90/11. Contractors Total Cost $204.77 <br /> Overhead&Profit $3717 <br /> Payment and Performance Bond $8.01 <br /> GL Insurance $2,297.63 <br /> Subtotal <br /> Total Change Proposal Cost 's <br /> x 30% <br /> ' DATE <br /> By acceptance of this Cost of Change,the project duration ACCEPTED $689.00 <br /> will,INCREASE TBD 0ays, REJECTED DATE <br /> DECREASE days, <br /> NOT CHANGE <br /> The Owner and Designer agree to pay for 30% of the total cost for the <br /> relocation and addition of lay-in fixtures. The ceiling grid was not <br /> installed as indicated on the plans and a photometric design was done <br /> based on the indicated layout and specified fixtures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.