Orange County NC Website
COST OF CHANGE WORKSHEET COC# 018 <br /> Morlando Construction,LLC MC Project#: 1003 <br /> Prepared By: Dominic Morlando Date:8/22/2011 <br /> Project: Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description My Unit Labor I Materials Sub Labor Material Subcontract Equipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> See gars Fence see attached) 1 $2,636.00 $0.00 $0.00 $2,636.00 $2,636.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> Skyrock Concrete see attached) 1 $100.00 $0.00 $0.00 $100.00 $100.00 <br /> $0.00 $0.00 $0.00 1 0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE: Contractors Subtotal $0.00 $0.00 1 $2,736.00 $0.00 $2,736.00 <br /> All Labor,Materials and Equipment to demo the existing gates, Sales Tax IN $0.00 " $0.00 <br /> supply and install a pair of new gates,additional concrete slab and Payroll&WC Insurance 37% $0.00 $0.00 <br /> epoxy down two(2)new wheel stops. New gate frames will be steel Contractors Total Cost $2,736.00 <br /> in lieu of wood as required by fence fabricator. The new columns Overhead&Profit $273.60 <br /> will be installed outside of the existing slab,unless OC wants us to Payment and Performance Bond $49.66 <br /> core drill the existing slab at an additional cost. GL Insurance $10.71 <br /> Subtotal $3,069.97 <br /> NMI <br /> Total Change Proposal Cost AWAND, $3,069.97 <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> Will,INCREASE TBD days, <br /> DECREASE days, REJECTED DATE <br /> NOT CHANGE <br />