Orange County NC Website
B&D Drywall & Acoustical, Inc. WBE <br /> 3800 Oak Grove Ave. <br /> Greensboro NC, 27405 <br /> Ph: 336-273-7595 <br /> Fax: 336-273-7595 <br /> Mobil: 336-240-6881 <br /> Date: 3/29/2011 <br /> To: Morlando Construction, LLC <br /> Aft: Dominic <br /> Project: Piedmont Food Building <br /> Change Order <br /> 1. Remove and replace insulation in place, install new C joists and <br /> clips as per new drawing in three places. <br /> Material Cost $382.38 — 54 LF of 8" C-Joists, 14 ga clips and misc <br /> fasteners <br /> Labor $924.00 — 3 man 14 hrs @ 22/hr <br /> Total $1,306.38 <br /> Thank You <br /> Betty Presnell <br />