Browse
Search
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:19:24 PM
Creation date
1/17/2012 4:04:08 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J`I LHC STRUCTURAL ENGINEERS <br /> _.._ <br /> 1015 Wade Ave. PO Box 10567 Raleigh,NC 27605 <br /> 919.832.5587 office 919.833.3929 fax <br /> FIELD REPORT <br /> DATE: 3-25-2011 <br /> TO: Corley Redfoot Zack, Inc. <br /> P.O. Box 2368 <br /> Chapel hill, NC 27515 <br /> PROJECT: Piedmont Foods PROJECT NO.: 0940 <br /> LOCATION: Hillsborough, NC TEMPERATURE: 60° <br /> CONTRACTOR: Morlando Construction WEATHER: Sunny <br /> OWNER: Orange County TIME ON SITE: 1:00 PM <br /> PRESENT ON SITE: Tim Knight <br /> THE FOLLOWING WAS NOTED: <br /> Interior walls were in place and ceiling joists had been installed. Workers on site were installed mechanical <br /> and electrical components. A discussion was held on site with Tim Knight about framing around the ceiling <br /> openings(ref. 1/S102). The opening is required to be 32"wide,meaning only one joist will be interrupted at the <br /> i <br /> A following discussion about the rooftop exhaust fans took place. Contractor provided information concerning <br /> the units'weight and rough locations. Contractor was informed that a sketch would be provided for a support <br /> frame at the three fan units. <br /> SIGNED: <br /> Matt Modlin, PE <br /> COPIES TO: Morlando Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.