Browse
Search
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:19:24 PM
Creation date
1/17/2012 4:04:08 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> B&D Drywall & Acoustical, Inc. WBE <br /> 3800 Oak Grove Ave. <br /> Greensboro NC, 27405 <br /> Ph: 336-273-7595 <br /> Fax: 336-273-7595 <br /> Mobil: 336-240-6881 <br /> Date 11/23/10 <br /> To: Morlando Construction LLC <br /> Att: Dominic <br /> Project: Piedmont Food <br /> Proposed Change Order <br /> 1 . Delete Retro Fit Insulation System $-20,408.00 <br /> 2. Install R19 Insulation unfaced supported by fiberglass mesh netting in <br /> place of retro fit system. In room 127 add metal studs and sheetrock <br /> to wall type B to extend to bottom of purlins, adds New ACT 2 to <br /> room 127 above new garage door. All new sheetrock to paint with <br /> epoxy paint. Add $15,706.00 <br /> 3. Savings of $4,702.00 <br /> Thank You <br /> Ronald Didonato <br /> Betty Presnell <br />
The URL can be used to link to this page
Your browser does not support the video tag.