Browse
Search
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-386 ED - Morlando Construction LLC for Piedmont Food & AG Processing Center - gen. construction changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:19:24 PM
Creation date
1/17/2012 4:04:08 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 / Corley Redfoot Zack, Inc. <br /> February 17,2011 <br /> SHOP DRAWING REVIEW COMMENTS <br /> Job#: 0910 <br /> Job Name: Piedmont Food and Agricultural Processing Center Renovations <br /> Sent to: Dominic Morlando <br /> With: Morlando Construction <br /> From: Chris Ford <br /> Shop Drawing No: 021 <br /> Specification Section: N/A <br /> Submittal Subject: Can Wash Canopy <br /> ® No Exceptions Taken ❑ Make Corrections Noted <br /> ❑ Revise and Resubmit ❑ Rejected <br /> 1. Color is to be White Baked Enamel. <br /> 2. The basin will have to be modified to allow for the columns. The rear lip <br /> can be formed in front of the columns,or block out around the columns <br /> to maximize basing area. <br /> Telephone (919)401-8586 Telefax (919)493-4802Can Wash Canopy-Reviewcomments.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.