Orange County NC Website
w <br /> COST OF CHANGE WORKSHEET COC# 001 <br /> Morlando Construction,LLC MC Project#: 1003 <br /> Prepared By: Dominic Morlando Date: 11/30/2010 <br /> Project:Piedmont Food <br /> Architect:Corley Redfoot Zack <br /> Unit Cost <br /> Description City Unit Labor Materials Sub Labor Material Subcontract Equipment Total <br /> $0.00 $0.00 $0.00 $0.00 <br /> Delete Retro Fit Insulation System 1 -$20,408.00 $0.00 $0.00 ($20,408.00) ($20,408.00) <br /> $0.00 $0.00 $0.00 $0.00 <br /> Add as discribed below 1 $15,706.00 $0.00 $0.00 $15,706.00 $15,706.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 1 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 $0.00 $0.00 $0.00 <br /> $0.00 <br /> $0.00 <br /> SCOPE: Contractors Subtotal $0.00 $0.00 ($4,702.00) $0.00 ($4,702.00) <br /> Install R19 unfaced insulation supported by fiberglass mesh netting Sales Tax $0.00 $0.00 <br /> mechanically attached to bottom of purlins in lieu of retrofit system. Payroll&WC Insurance 37% $0.00 $0.00 <br /> In room 127 add metal studs and sheetrock to wall type B to extend Contractors Total Cost ($4,702.00) <br /> to bottom of purlins,add new ACT 2 to room 127 above new garage Overhead&Profit ($235.10) <br /> door.All new sheetrock to paint with epoxy paint. Payment and Performance Bond $0.00 <br /> GL Insurance $0.00 <br /> Subtotal ($4,937.10) <br /> Total Change Proposal Cost -DEDUCT ($4,937) <br /> By acceptance of this Cost of Change,the project duration ACCEPTED DATE <br /> will,INCREASE days, <br /> DECREASE days, REJECTED DATE <br /> NOT CHANGE XXX <br />